D. Check for leaks. As stated above The RO System will run until al
supply lines and storage tank are filled and charged to the pressure of the
building. This may take several hours to happen. Again, make sure that the
drain is working – if the drain line is fed to a condensate pump the pump MUST
BE OPERABLE! The RO System has an automatic shut off valve (ASO) that
is completely mechanical and will only open and pass water to drain when the
pressures are not equalized between the domestic water supply and the
humidifier supply lines. If there are any q
Factory Representative.
III) Accessories:
A. If the system was provided with a controlling humidity sensor then install it
and wire it from the Generator panel at the appropriately labeled locations on
the terminals. Refer to the Wiring Diagram
unit for proper landing locations and line sizes.
recommended but not required.
B.
Do the same as the above with both the High Limit humidistat and the Air
Flow switch if provided. Terminal locations are again labeled in the Wiring
Diagram provided with your Unit.
dampers.
C. If a BAS signal is being provided then connect it to the proper terminal
locations in the Generator as labeled in the
Unit. In this case a separate 24VAC signal is required to turn on the
humidifier.
As stated above The RO System will run until al
supply lines and storage tank are filled and charged to the pressure of the
building. This may take several hours to happen. Again, make sure that the
if the drain line is fed to a condensate pump the pump MUST
The RO System has an automatic shut off valve (ASO) that
is completely mechanical and will only open and pass water to drain when the
pressures are not equalized between the domestic water supply and the
humidifier supply lines. If there are any questions or issues please contact your
Factory Representative.
If the system was provided with a controlling humidity sensor then install it
and wire it from the Generator panel at the appropriately labeled locations on
Refer to the Wiring Diagram (see Fig.2 ) provided with your
unit for proper landing locations and line sizes. Shielded control wire is
recommended but not required.
Do the same as the above with both the High Limit humidistat and the Air
ovided. Terminal locations are again labeled in the Wiring
Diagram provided with your Unit.
CAUTION:
locate AFS before any
S signal is being provided then connect it to the proper terminal
locations in the Generator as labeled in the Wiring Diagram provided with the
In this case a separate 24VAC signal is required to turn on the
5
As stated above The RO System will run until all the humidifier
supply lines and storage tank are filled and charged to the pressure of the
building. This may take several hours to happen. Again, make sure that the
if the drain line is fed to a condensate pump the pump MUST
The RO System has an automatic shut off valve (ASO) that
is completely mechanical and will only open and pass water to drain when the
pressures are not equalized between the domestic water supply and the
uestions or issues please contact your
If the system was provided with a controlling humidity sensor then install it
and wire it from the Generator panel at the appropriately labeled locations on
provided with your
ded control wire is
Do the same as the above with both the High Limit humidistat and the Air
ovided. Terminal locations are again labeled in the Wiring
locate AFS before any zone
S signal is being provided then connect it to the proper terminal
Wiring Diagram provided with the
In this case a separate 24VAC signal is required to turn on the