Air-to-water Heat Pump Split Versati
34
SPLIT TYPE
Description
Joint pipe thread
Circulating water inlet/outlet of main unit
1″Male BSP
Cooling water inlet of water tank
3/4″Female BSP
Circulating water inlet/outlet of water tank
3/4″Female BSP
Hot water outlet of water tank
3/4″Female BSP
Code
Name
QTY.
Function
01842800004P01
Retaining Plate Sub-Assy
2
Fix the water tank to the wall
70210087
Bolt M6X16
4
/
70110066
Swell Screw M8X60
2
/
0738280101
Relief Valve 1/2
1
/
035033000012
Water Pipe Connector
1
Connect the water pipe and Water inlet pipe sub-assy
06332800003
Nut
1
Install on the 3way connector
75042805
Gasket
2
Sealing function, see below blue circle
030059000120
Water inlet pipe sub-assy
2
/
05332800002
Drainage Pipe(Rubber)
1
The drainage pipe using for the relief valve to drainage the
water
70814016
Pipe Hoop φ13
1
Fix the drainage pipe
2690280000502
Extruded strip
1
Fix the water tank and avoid the damage appearance of the
water tank
0184280000502P
Fixing strap
1
Fix the water tank to the wall
Notes
(a)
Distance between indoor unit and water tank should not exceed 5m levelly and 3m vertically. If higher,
please contact with us. Water tank on lower and main unit on higher side is recommended.
(b)
Prepare the materials according to the above joints dimension. If cut-off valve is installed outside the room,
PPR pipe is recommended to avoid freeze damage.
(c)
Waterway pipelines can’t be installed until water heater unit is fixed. Do not let dust and other sundries
enter into pipeline system during installation of connection pipes.
(d)
After connection of all waterway pipelines, perform leakage test firstly. After that, perform heat preservation
of waterway system; meanwhile, pay more attention to valves and pipe joints. Ensure enough thickness of
insulated cotton. If necessary, install heating device for pipeline to prevent the pipeline from freezing.
(e) Hot water supplied from insulated water tank depends on pressure of water tap, so there must be supply of
tap water.
(f)
During using, the cut-off valve of cooling water inlet of water tank should be kept normally on.
18.4 Electric wiring work
18.4.1 Wiring principle
General principles
(1) Wires, equipment and connectors supplied for use on the site must be in compliance with provisions of
regulations and engineering requirements.
(2)
Only electricians holding qualification are allowed to perform wire connection on the site.
(3)
Before connection work is started, the power supply must be shut off.
(4) Installer shall be responsible for any damage due to incorrect connection of the external circuit.
(5) Only copper wires are allowed to be used.
(6) Connection of power cable to the electric cabinet of the unit
(7) Power cables should be laid out through cabling trough, conduit tube or cable channel.