84
for North America
7. Screw the
motor.
●Use a screwdriver to screw the
motor.
8. Install and
screw the louve
r.
●Install the louver and use a wrench
to screw the louve
r.
9. Install and
screw the water
tra
y.
Loosen the
scre
w
s
●Use a screwdriver to screw the
water tray
Pump
Step
Diagram
Operation Procedure
1. Unscrew the water tra
y.
Loosen the
scre
w
s
●Use a screwdriver to unscrew the water tra
y.
2. Remove the water tra
y.
●Replace the water tra
y.
3. Remove the drainage duct
and unscrew the pump.
1. Unscrew the outlet pip
e
2. Unscrew the pu
m
p
3. Remove the drainage duct and use a
screwdriver to unscrew the pump.
Ultra Heating GMV5 Multi VRF
Summary of Contents for ULTRA heating GMV-36WL/B-T
Page 1: ...Ultra Heating GMV5 Multi VRF for North America R410A GC201603 1 ...
Page 3: ...1 Ultra Heating GMV5 Multi VRF for North America PRODUCT PRODUCT ...
Page 15: ...13 for North America CONTROL CONTROL Ultra Heating GMV5 Multi VRF ...
Page 38: ...36 Ultra Heating GMV5 Multi VRF for North America INSTALLATION ...
Page 66: ...64 for North America MAINTENANCE Ultra Heating GMV5 Multi VRF ...
Page 71: ...69 for North America Ultra Heating GMV5 Multi VRF 3 Discharge temperature protection ...
Page 95: ...JF00302969 ...