Make sure the guide louver and the filters are properly positioned in the ceiling grille.
2.
Secure the ceiling grille to the ceiling assembly frame with 4 screws.(see Figure 10).
3.
Switch on the power supply and check the unit work or not.
4.
Check the thermostat position. Make sure the thermostat is routed through the holding guide
and is not touching any metal surface.
1.
STEP 4-COMPLETING THE INSTALLATION
To complete the installation and system checkout requirements, the following steps must be
performed.
Frame
Ceiling Grille
4 Screws
Figure 10
- 15 -
Summary of Contents for RVA-135R
Page 20: ......