terminal
.
4 .
5
.
6
.
1.
①
②
☆
23
Fig.3
Note:
Power connect wire
Blue
Black
Brown
Yellow-green
Cover back panel.
Cover connection cover plate on where it is, tighten bolts to ensure connection
cover plate had tighten power connect wire.
As shown in fig.3, connect the blue wire of power connect wire onto terminal
'
N
(1)'
, black on onto terminal '2', brown to '3' and yellow-green one (earth wire) to
Install indoor unit
When routing the pipe (wiring) from the left or right side, cut off the tailings of the
left pipe on base of main unit (as shown in fig.4).
Cut off tailing 1 when only power cord is routed;
Cut off tailings 1 and 2 (or 1, 2 and 3) when connection pipe and power cord
are routed.
All electric installation must be done by professional personnel according
to local law, regulation and this instruction.
Power must adopts rated voltage and special circuit for air conditioner.
Do install creepage breaker and air switch of proper capacitance
(25A)
Installation should be conducted by National Wiring Regulation.
Please select the qualified fuse.
The diameter of power cable should be enough, if the
power cable and
A air switch having a contact separation of at least 3mm in all poles should
the connection wire are damaged, that should be replaced by the exclusive
be fixed in fixed wiring
.
wires.
The temperature of refrigerant circuit will be high, please keep the interconnection
cable away from the copper tube.
7
.