Multi Variable Air Conditioners One-way Cassette Type Indoor Unit
11
Unit: mm(inch)
Fig.4.3.4
4.3.3 Test of Drainage System
(1) Please test drainage system after electric work is finished.
Inject approximately 1L purified water to drain pan from air vent, ensure that not to splash the
water over the electrical components (e.g. water pump. etc.).
1) Inject approximately 1L purified water to drain pan from air vent, ensure that not to
splash the water over the electrical components (e.g. water pump etc.).
2) In case of commissioning finished, please energize the IDUs and switch to cooling or
dry mode, meanwhile, the water pump operates, you can check the draining through
the drain socket.
3) If communication wire is not connected, communication malfunction “C0” will occur
after 60s of energizing. In this case, the water pump operates automatically. Check if
the water pump drains normally through drainage port. The water pump will stop
automatically after running for 10mins.
(2) During the test, please carefully check the drainage joint, make sure no any leakage
occur.
(3) It’s strongly recommend to do the drain test before ceiling decoration.
Unit:mm(inch)
Fig.4.3.5