8
6
INSTALLATION INSTRUCTIONS
NOTE:
SAVE CARTON and these INSTALLATION
INSTRUCTIONS for future reference.The cartion is the
best way to store unit during winter,or when not in use.
TOOLS NEEDE
Phillips Screw Driver
Drill(If pilot holes are needed
)
TOOL NEEDED
Phillips Screwdrive
A.Remove the air conditioner
from the carton and place on
a flat surface.
B.Remove top rail from the bottom
of the packaging material as shown
in Fig.A
those in the top of the unit as
D
.Align the hole in the top rail with
shown in Fig.B
When handling unit.be careful to avoid cuts from sharp
metal edges and aluminum fins on front and rear coils.
Before installing unit,the top rail must be assembled on the unit
You air conditioner is designed to install in standard double
hung windows with opening widths of 23 to 36 inches
(584 mm to 914 mm)(FIG.1)
lower sash must open sufficiently to allow a clear vertical
opening of 14-1/2 inches (368mm).
Side louvers and the
rear of the AC must have clear air space to allow enough
airflow through the condenser,for heat removal.The rear
of the unit must be outdoors,not inside a building or
garage.
Some assembly is required.Please read these instructions
carefully.
NOTE:FOR SAFETY REASONS,ALL
FOUR(4)SCREWS MUST BE SECURELY
FASTENED.
Mounting Hardware
Top Rail Hardware
Qty.
Qty.
4
1
3/8” Screw
3/4” Screw
Top Rail
Sash lock
1
C .
Tear off the paster at back side of
sponge, and then align it at the
bottom edge of upper guide rail to
stick the sponge at the bottom of
upper guide rail. (The sponge has
been stick on the upper guide rail
for some models.Therefore, this
step can be omitted.)
E
.Secure the top rail to the unit
with the 3/8”screws as shown
in Fig.C
upper guide rail
sponge
Top Rail
packaging
Fig.A
Fig.B
Fig.C