![Gree FXA2A-D Owner'S Manual Download Page 15](http://html1.mh-extra.com/html/gree/fxa2a-d/fxa2a-d_owners-manual_2260632015.webp)
BU Module
11
4
Installation Instruction
1)
Check the installation location and ensure it is strength and level. Otherwise, there should be
enough space to install drainage pipe, so that the condensed water can be discharged.
2)
Reference to the size of hanger metal and drill 4 holes in the installation location.
3)
Hang the hanger bolts.
Fig. 13
4)
Fix the modules securely with the hanger bolts. You can get the M10 or M8 hanger bolts, nuts
and washers from the market.
Fig. 14 (mm)
5)
Adjusting the nuts position, so that the BU module should be level in front/back and left/right.
Summary of Contents for FXA2A-D
Page 4: ......