
Spartan
II
607
Preparation and Setup
Great Plains | 166-486M | 2019/01/29
23
4. Store the other chock in the top channel guides
of the same holder, upside-down, short end
toward frame.
5. Repeat step 2 through step 4 for the other side.
Drill Height and Leveling
All frame sections must be at the correct height and
level to maintain even planting depth. The hitch
height sets the cart frame level.
Periodic leveling adjustments should not be
necessary. If you are having problems with uneven
depth, check drill levelness and follow these
procedures.
Consistent Seeding Depth Risk
Level the frame in the current field
conditions. Failure to do so may result in
the implement not producing the desired
results.
Tongue Height
Drill must be unfolded for this procedure.
1. Bleed the hydraulics. See “
2. Unfold the drill fully.
3. Set the initial tongue height, tractor hitch, and
change implement hitch configuration as
necessary. Measure the distance at the bottom of
the hitch to ground level.
4. If you cannot get the desired height with the
normal range of the hitch, relocate the hitch in
the tongue bolt holes. Always have two bolts in
two sets of hitch holes and two sets of tongue
holes.
1
38263B
!
Hitch
Position
Hitch Height
Bottom to Ground
A
38.1 cm
B
45.7 cm
C
53.3 cm
D
61.0 cm
38274A
A
B
C
D