![GREAT PLAINS 1006NT Original Instructions Manual Download Page 24](http://html.mh-extra.com/html/great-plains/1006nt/1006nt_original-instructions-manual_2259398024.webp)
01/22/2018
Table of Contents
150-285Q
706/1006NT
Table of Contents
Setup
20
Leveling Drill
Refer to Figure 19
1.
Loosen jam nuts (1) and adjust cylinder eyebolt nuts
(2). The eyebolts (3) are factory pre-set to:
(4) 4
3
4
in (12.1cm)
of exposed thread above mounting plate.
2.
Raise drill with hydraulics until openers and coulters
are 1 to 2 inches (2.5-5cm) off ground.
3.
Measure height (5) of coulter tube from ground on
both ends of drill.
4.
Adjust eyebolt to level drill from end to end.
5.
Tighten jam nuts (1) on eyebolts (3) when drill is
level.
NOTE:
Do not exceed 5in (12.7cm) of thread above mounting
plate. This could result in hydraulic cylinder damage.
Install Accessories and Options
Acremeter Installation
Refer to Figure 20
The acremeter (1) is supplied from the factory in a
separate carton, to minimize risk of shipping damage.
NOTE:
The electronic acremeter display is normally blank. To
confirm that it is working properly prior to installation,
rotate the housing several times. When shaft rotation
stops, the LCD display activates after 30 to 60
seconds, and remains visible for 30 to 45 minutes.
Screw the threaded end of the meter into the
1
2
-20
tapped hole (2) in the left end of the gearbox input shaft.
Tighten the threaded end only enough to prevent it from
working loose from normal vibration. In use, there is no
torque or tension that might tend to unscrew it.
Figure 19
Leveling Drill
21704
4
5
1
2
3
Figure 20
Acremeter Installation
21788
2
1