STANDARD POWER STRIP MOUNTING

For your convenience, we have provided mounting 

brackets in the left rear and right rear corners of the 

enclosure for mounting power strips vertically.  

Typically, any power strip shipped with 

an enclosure will be installed at the 

manufacturer. To install a power strip 

in the field, remove the #10-32 x 1/2" 

screws that secure the bracket to the frame. 

Place the power strip into the corner 

post of the frame and then place one

bracket between the top two outlets 

and install the #10-32 x 1/2" 

screw into the threaded hole in 

the frame.  Then place the other 

bracket over the power strip 

between the bottom two outlets 

and secure to the frame with the 

same type of screw.

POWER

When using power distribution units (PDUs), each PDU should be 

connected to a committed branch circuit that is rated for the continuous 

load of all the equipment connected. When not using a PDU, each piece 

of equipment should be connected to a dedicated branch circuit.

DETAIL A

Summary of Contents for GL720E-2432

Page 1: ...nclosures GL720E 2432 GL720E 2436 GL720E 2932 GL720E 2936 GL840E 2432 GL840E 2436 GL840E 2932 GL840E 2936 E Series Enclosures Installation Instructions UL60950 1 UL2416 E Series Equipment Cabinet Rack...

Page 2: ...the E Enclosure could result in equipment damage serious injury or possible death Only trained service personnel should be used to remove the enclosure from the pallet Also be sure you have a suffici...

Page 3: ...needed depending on configuration 50 M6 cage nuts 3 8 square and M6 screws 10 32 tapped rails available must be specified at time of order This user s manual This user s manual applies to the followin...

Page 4: ...ing enclosures before installation Sudden stops and starts excessive force obstructed routes and uneven floor surfaces may cause the enclosure to topple over Loading Equipment WARNING Only install equ...

Page 5: ...NG DOOR SWING HANDLE OPERATING DOOR SWING HANDLE INTERCHANGING DOOR HANDLES Door handles on all doors can be interchanged with any one of Great Lakes optional swing handles CH 02 three digit combinati...

Page 6: ...note The easy latch slam is not compatible with 3 point latching split doors ASSEMBLYOFSWING LATCHHANDLEONALLOTHERDOORS STANDARD MESH STEEL PLEXIGLAS AND PERIMETER VENTED DOORS 5 0 T H K Standard fla...

Page 7: ...hree hinge pins pull the door away from the enclosure To attach the door align all three hinges of the door to their respective hinge pins on the enclosure and slowly slide the door down until seated...

Page 8: ...MOUNTING SIDE PANEL REMOVAL Before removing the side panel pull apart the quick disconnect grounding wires The side panels are secured to the enclosure frame with two quick release latches and a keyed...

Page 9: ...3 thds and will accept the levelers Once the levelers 7209 HD or 7209 4HD are installed the cabinet level can be adjusted with the use of a 5 8 open wrench when adjusting from the outside or a 3 8 clo...

Page 10: ...TPE F TPE F10 TPE 2F10 Solid Perforated Three One 10 550 Two 10 550 75 CFM Fans CFM Fan CFM Fans BOTTOM PANELS There are several styles of panels available for the bottom of your E Series enclosure O...

Page 11: ...sure has two pairs 12 ga steel powder coated rails come installed with all standard frames at 19 EIA 310 E The 29 W E enclosure can be configured to 23 EIA mounting with an optional replacement bracke...

Page 12: ...he power strip into the corner post of the frame and then place one bracket between the top two outlets and install the 10 32 x 1 2 screw into the threaded hole in the frame Then place the other brack...

Page 13: ...nt Universal Power Strip Brackets in an E enclosure or cabinet extension measure the required mounting distance top to bottom install brackets then install power strip Spring Clips Tinnerman Clips 10...

Page 14: ...kit of 24 sections Fingers can be installed on the front or rear rails but front rails must be recessed 4 5 for proper installation It is recommended that each CM 47 be installed using 3 points of at...

Page 15: ...so available Additional horizontal bars can be installed alone without a vertical bar or in conjunction with a kit Additional vertical bars can only mount when at least two horizontal bars are already...

Page 16: ...e VCB 7236 Cable Management Bar Kit for 720E 36 enclosure VCB 8432 Cable Management Bar Kit for 840E 32 enclosure VCB 8436 Cable Management Bar Kit for 840E 36 enclosure VCB 72 Single Vertical Cable B...

Page 17: ...tallation in a Great Lakes E Enclosure is identical ZERO RMU MOUNTING ZR1 ZR2 Both ZR bracket kits fit on the 29 W E enclosure These allow for 0 RMU outside of the EIA rail pattern mounting of 19 rack...

Page 18: ...to the common building ground The kit contains one 48 L ground wire assembly and five 24 L ground wire assemblies Each assembly is made of two smaller wires that are connected this allows a Quick Dis...

Page 19: ...individual devices and components mounted within an enclosure to be grounded they must be connected to a copper bus bar Available copper bus bars include CBB 19 Copper Bus Bar for 19 rack mounting Is...

Page 20: ...FORM MS 5 02 58 REV 0 ETSI Associate Member Thank you for your business...

Reviews: