
18
1. The mains supply to the unit must
be first switched off!. The main Lid is
removed by unclasping the fasteners
highlighted in diagram.
3. Inspection of wear and tear parts.
Including wiper blade, lid seal gasket
and strainer seals. Replacement of any
parts found to be worn or defective.
2. The internal chamber walls are
power/steam cleaned. Both chambers
are then pumped out completely. The
heating element should be checked
and cleaned using a plastic brush. The
unit is refilled using the water flow from
the sink.
4. Electrical checks including controller,
heater and motor checks. Optimisation
of operation should be made if
necessary.
tRi-MontHly (90 dAys) seRvice
by approved service partner
To ensure correct longterm performance and to comply with our warranty terms all
units
must
be serviced tri-monthly. This must be carried out by an FM Environmental
approved service partner in possession of the necessary waste carriers licence for
your area.
Summary of Contents for GGX15
Page 24: ...24 Appendix 1 Wiring diagram 110V...
Page 25: ...25 Wiring diagram 230V...
Page 29: ...29 notes...
Page 30: ...30 notes...
Page 31: ...31 notes...