background image

6

7

 

Angle adjuster 

Tighten the screws

projector

 

mounting Bracket

Screw

 

rod

Grille ceiling

Concrete base

screw nut

Concrete base

screw nut

Cushion

For the convenience of installation, the side plates of the cage can be removed first. After the installation is 

completed, the installer can stand in the cage and reinstall the side panels. At this time, the side panels must 

be turned over and installed.

If it is necessary to adjust the limit height due to the installation environment or the limitations of the site, it 

must be adjusted by a special technician or call after-sales.

1. Lower the bamboo joint of the lift to the height suitable for the installer to install the projector, and remove 

the mounting feet on the bamboo joint.

2. After the mounting feet are fixed on the projector, re-attach the projector and the mounting feet to the angle 

adjuster and tighten the screws.

(Note: Be sure to confirm that the screws are securely locked, be 

careful to prevent the projector from accidentally falling!)

Projector installation

3.After checking that the tapping screw is fixed, install the screw rod

 

and fix it. (In order to

 make the screw rod easier to pass through the lifter, we recommend that the end of the 

screw rod be tapered, and the length between each two lead rods can differ by 10-20mm.

recommended to sharpen the end of the screw into

 a taper that makes it easier to pass through the 

screw hole of the lift

4

.

Lift the lifter to the height of the installation position by using the lifting equipment, and

 pass the screw rod through the four holes of the lifter. Adjust the height of the lifter with the

 

screw nut so that it is flush with the height of the ceiling layer. Remove the

 

excess screw

 

rod

.

Please note that you must touch the upper limit switch to stop the projector lift from rising!

The level above the electric lift must be adjusted to the level, Tilting can cause the electric hanger to 

malfunction.

M10 rod x4

Grille ceiling

make the decorative frame fils on the celing layer

5.install the decorative frame so that the decorative frame fits on the ceiling layer and the

installation is complet

ed.In order to prevent the lift falling down,We suggest add 4pcs steel rods 

(Ø3-Ø4mm dia 

requir

ed)at the fou

rs end cor

ner,and place it in

to the ceiling as well.

Suggest to add four Ø3-Ø4mm

 steel wires to reinforce the fall

 prevention

Summary of Contents for GPAC76Series

Page 1: ...e use Please read the collection after reading for future reference Model GPAD76 Series Grandciew Crystal Screen Guangzhou Co Ltd Guangzhou Jude Intelligent Audiovisua l Equipment Co Ltd No 43 S Guoma...

Page 2: ......

Page 3: ...ise accident may happen and falling risk there Caution Please do read the caution incorrect operation will cause accident and product damage 12 Figure9 Figure10 Figure11 Troubleshoot This product is d...

Page 4: ...t direction of positive and negative pole according to picture 3 Reinstall cover and screw Remote control Notes Battery installation 1 Picture 8 when projector lift is under loading status long press...

Page 5: ...trol code UP ff ee ee ee dd STOP ff ee ee ee cc DOWN f Learn address code instruction if aa Can be any character or number If input ff 11 11 11 aa It is ff 11 11 11 dd actually Other codes do the same...

Page 6: ...rwise it will cause damage to the lift Remote Localizer Need to set the lower limit opened the door of electric double mask when finished surface layer board to smallpox press the pause button will th...

Page 7: ...nch to loosen the screws on the mounting feet As shown in Figure 3 adjust the screws to the desired length and retighten the screws Angle adjustment Electrical product instructions Concrete base 2 Pun...

Page 8: ...ed install the screw rod and fix it In order to make the screw rod easier to pass through the lifter we recommend that the end of the screw rod be tapered and the length between each two lead rods can...

Reviews: