Note: the upward instruction shows us installation of external control system, if the users want to add other control 

systems, please follow the steps as below:

1)Loose the screws of power box and take out the power box (because 

the power cord has a limit, please do not 

draw it strongly). Then loose two rubber screws again, and remove the 

end cap (please ensure the power line is 

fixed), step 3 can be follow.

2)Insert the control system signal line to corresponding output (figure 11), 

and take out the signal line from control 

system signal line exit (figure 19).

3)Reinstall the end cap after completed control system and fasten the

 two rubber screws then reinstall the power box and fasten two screws 

according to step 8.

10. Install the front baffle as following steps

1)  Extend the screen and keep the rear baffle opening

2)  Disconnect the power of screen

and then install the front baffle

3

Please ensure the security lock is unlocked (figure  22).

4

Install the front bafle (figure 23)

5

Unlock the security lock of baffle (

), insert the 

plug of security to a hole of end cap (figure 26), if the baffle can not 

move up that please align baffle with ceiling board.

6

Connect the power after installation

figure 24

figure 25

Figure21

Signal Line Exit

Figure22

Figure24

Figure25

Figure26

Figure23

5.Please stay the screen in the opposite direction, and fix the left and right hanging board on the screen using 
M6 screw and nut (figure 12).

6. Install the whole screen on the hanging bracket (figure 13-14)

7. Fix the screen using M12 nut (figure 15), then adjust the security distance to H (the distance between concrete roof and ceiling 
surface) using adjusting screw. Loose the M12 nut and fix the whole screen, and then connect the power (figure 16).

5

Figure13

figure 12

Figure15

Figure14

1)
in the groove of casing. 

Stay the M6 allen screw 

2)  Install the hanging 
board

3) Please ensure the 
distance between edge 
of hanging board and the 
edge of casing is 5mm.

4) Fasten the hanging board 
using M6 nut, and install other 
hanging board at the same way.

Hanging Board

Casing Groove

M6 Allen Screw

     

M6 Nut

     

8. Cut the separated ceiling board in a suitable size, which can fill in the size of space as screen (figure 17-18).

Figure18

Figure17

Figure16

5.0

Unlocked

Locked

M12 Screw (4pcs)

M12 Nut

Power Line

1) Insert the baffle to top groove.

2) Stay flat the baffle, 
and clip it to low groove.

3) Press the baffle slightly 
and align it with ceiling board.

Top Groove

Low Groove

Ensure two faces 
are the same level

Summary of Contents for Cyber Series

Page 1: ...anual Power line disconnection Screen responds nothing to any operation B1 B2 H W A B3 L 170 170 Reason Solution GRANDVIEW REPRODUCING GENUINE COLORS Thank you for purchasing a Grandview projection screen Before use please read instructions carefully After installation store instructions for future reference B1 B2 B3 32 6 35 8 35 9 39 9 40 4 44 8 32 2 35 6 33 0 36 4 35 5 39 5 37 4 41 4 38 8 43 0 4...

Page 2: ...about power line device interface power plug please contact the professional people 11 After installation please locate a power device in order to disconnect power or connect the power plug to electrical socket This electrical socket should be installed to a convenient position If the accident occurs during operation please disconnect power or take out the power plug 12 The ceiling or wall used fo...

Page 3: ...ile operating too much retracting will cause the damages of screen and motor E Synchro Power Relay optional After connecting the Wireless Synchr o Conver ter the screen can be controlled by FM modulation wireless controller which can cooperate with Sychro Power Relay and switch of projector to control the up and down of screen synchronously D External Wall Switch optional The wall switch is availa...

Page 4: ...tallation 1 Turn the controller around push to open the cover as guide arrow 2 Put the battery in according to the guide of cathode anode 3 Close the cover 二 External Control System Four control systems are available for motorized screen 1 Manual Control 2 Infrared Remote Control IR 3 Dry Contact 4 Switch EXT CTRL TRIG EXT IR Trigger Dry Contact RS232 External Infrared Receiver B Infrared Remote C...

Page 5: ...gur e 5 TRIG Trigger EXT IR External Infrared Receiver EXT CTRL Dry Contact RS232 Figur e 10 Signal Output Switch M4 Screw Note the power box must be buttoned on the hanger of bracket Bracket Power Box End Cap Board Figur e 11 Four Hangi ng Boar ds are in middl e 100 H L 94 minus H 100 minus 180 100 Figur e6 Power Line Figur e7 Figur e8 Figur e9 11 Controller Buttons Function Instruction 1 Press b...

Page 6: ...ith ceiling board 6 Connect the power after installation figure 24 figure 25 Figure21 Signal Line Exit Figure22 Figure24 Figure25 Figure26 Figure23 5 Please stay the screen in the opposite direction and fix the left and right hanging board on the screen using M6 screw and nut figure 12 6 Install the whole screen on the hanging bracket figure 13 14 7 Fix the screen using M12 nut figure 15 then adju...

Page 7: ...in and remove the end cap please ensure the power line is fixed step 3 can be follow 2 Insert the control system signal line to corresponding output figure 11 and take out the signal line from control system signal line exit figure 18 3 Reinstall the end cap after completed control system and fasten the two rubber screws then reinstall the power box and fasten two screws according to step 4 Figure...

Page 8: ...line cover of end cap and then fill in the power line Afterward stuck the line cover back to end cap then install the power line outside the casing figure 9 5 Please complete the installation of end cap and fasten two rubber screws do not need to install the power box at this moment 5 Install the whole screen on the hanging bracket figure 11 12 Figur e 4 Figur e 5 Figure9 Figure7 Figure8 Figure6 F...

Reviews: