DOOR INSTALLATION
5.7
Slide the (2) S02 bolts down the track of the L21, align with the holes on the 603D door header. With one person inside the
greenhouse line up hanging door track L21 with door header 603D, move bolts on L21 to line up with bolt holes on door header
603A. From the inside hand tighten the ML01 nut while the person outside is holding the L21 in position, you will now center on
the front of the greenhouse and tighten the S02/ML01 combo.
1
S02
L21
603A
37
STEP FIVE
Summary of Contents for Ascent 8x8 KIT
Page 46: ...NOTES NOTES 45...