
OPERATING THE CRAFT
42
Inflation valve. Option 2
If the boat is equipped with a valve as shown in figure 14, follow the instructions below.
To open the valve cap turn it a quarter counter clockwise. The plunger should be in the upper
(closed) position.
Fig. 14. Inflation valve (option 2).
Begin the inflation procedure according to the sequence shown in figure 14. Initially, partially inflate
each chamber (approx. 0.1 bar (1.45 psi) then repeat the procedure inflating each chamber to its
nominal pressure, 0.15 bar (2.15 psi).
Summary of Contents for S370N
Page 1: ......
Page 2: ...CONTENTS...
Page 3: ......
Page 4: ...CONTENTS...
Page 64: ...OPERATING THE CRAFT 64 BOW STEP PLATE IF APPLICABLE Fig 35 Bow step plate Cleat Anchor roller...
Page 78: ...TECHNICAL DETAILS 78 GENERAL VIEW OF A BOAT S370NF Fig 45 General view of a boat S370NF...
Page 80: ...TECHNICAL DETAILS 80 GENERAL VIEW OF A BOAT S370NSF Fig 47 General view of a boat S370NSF...
Page 82: ...TECHNICAL DETAILS 82 GENERAL VIEW OF A BOAT S370NLF Fig 49 General view of a boat S370NLF...
Page 86: ...TECHNICAL DETAILS 86 GENERAL VIEW OF A BOAT S420N Fig 53 General view of a boat S420N...
Page 88: ...TECHNICAL DETAILS 88 GENERAL VIEW OF A BOAT S420NL Fig 55 General view of a boat S420NL...
Page 92: ...TECHNICAL DETAILS 92 ELECTRICAL SCHEMATIC DIAGRAM Fig 59 Electrical schematic diagram...
Page 106: ...FOR YOUR NOTES...
Page 107: ......
Page 108: ......