OPERATING THE CRAFT
26
OPERATING THE CRAFT
Unpack the boat and unfold the inflatable tube. Activate all valves into inflation position
(look below).
Straighten the keel along the bottom axis so that the keel valve may be faced upwards.
Assemble the rigid floor following the instructions below.
SECTIONAL FLOOR INSTALLATION
1.
Floor section
2.
Lateral beam
3.
Removable H-shaped stop
4.
Transom stop
5.
Transom
Fig. 4. Sectional floor. General view.
Summary of Contents for ranger R380
Page 1: ......
Page 2: ...CONTENTS ...
Page 3: ......
Page 4: ...CONTENTS ...
Page 71: ...FOR YOUR NOTES ...
Page 72: ......
Page 73: ......