GRAND Golden Line G500LF,G500GLF
UM15000
In order to set the boat in operation condition perform as follows:
-
unfold the inflatable tube;
-
mount outboard engine on the transom in accordance
with it`s own installation instruction.
-
extend engine remote control cables and steering
cable from engine mounting place to steering console mounting
place through holes on the deck and helm stowage.
STEERING CONSOLE INSTALLATION
In order to install the windscreen onto console perform the next
operations ( Fig. 2 ):
-
align the windscreen holes with holes on console overhead
part;
-
fix windscreen by means of screws M6x25, bushs #1,
bushs #2, serrated lock washers, washers and
nuts M6 from the complete set;
-
tighten all nuts.
In order to install the windscreen railing onto console perform the
next operations ( Fig. 2 ):
-
align holes in the windscreen railing supports with
holes on console overhead part;
-
fix windscreen railing by means of bolts M8x30, serrated
lock washers and washers from the complete set;
-
tighten all bolts.
In order to install the steering console, perform the next operations
( Fig. 2):
-
open the front seating;
-
align console bottom holes with holes in the deck
surfaces and fix console to deck by means of bolts M8x30,
serrated lock washers and washers from complete set;
-
close front seating.
STEERING CONSOLE INSTALLATION
PREPARATION FOR EXPLOITATION.
9
Fig.2
ATTENTION !
To avoid the water penetration into the
console inner layers, please, tight all the hole free space
with any water resistant filler.