
Parts required for this step:
installation
23
step 18
18.1 Install the Mosquito Netting (P) along the tracks by
inserting the Hooks (X) one at a time into the eyelets
found along the top border of the netting.
Repeat for all four mosquito panels.
noTe:
The netting should be installed starting in the middle of the 12 foot
side of the unit, wrap around the inside of the post, and finish the
installation in the middle of the 10 foot side of the unit. The zippers
to close the netting will therefore meet in the center of the each side
of the sun shelter.
P
X
4
P
P
X
P
X
4
X
4