
installation
22
step 17 (continued)
17.5 Secure a Finishing Roof Side Structure Bar (F1) to Finishing Roof Side Structure (F) on the 10 foot side with
Corner Finishing End (R) and Screw (V).
17.6 Repeat working your way around the entire unit until coming to the last corner where the installation of the
Finishing Roof Side Structures began.
17.7 Undo screw (V) and align the pre-drilled holes of the first and last side structure which were installed.
Secure both bars in the corner with a Corner Finishing End (Q) by inserting a Screw (V).
V
R
F1
F
R
V
R
V
Q
noTe:
The 10 foot sides of the unit do not require having
Finishing Roof Side Structure (F2) installed on them.
CaUTIon:
2 people are required for this step.