2.6 ASSEMBLE & INSTALL BURNER
ASSEMBLE
Check burner model is correct for furnace rating required. Assemble as
per burner manufacturer’s instructions.
SET END CONE
Riello - Set turbulator as per furnace operating decal or section
3.0
BURNER SPECIFICATIONS
. Beckett – See burner manufacturer’s
instructions.
SELECT NOZZLE
Select oil input, nozzle required and burner configuration as shown on
furnace operating decal or section
3.0 BURNER SPECIFICATIONS
.
INSTALL NOZZLE
Install nozzle, check for clean seating and tighten nozzle adaptor.
ELECTRODES
See burner manufacturer’s instructions for correct setting.
INSERTION
See
section
6.0 GENERAL SPECIFICATIONS
or Figure - 1.
LENGTH
MOUNT BURNER
Tighten top nut first so burner tips down slightly. The burner is always
installed in an upright position by four nuts.
PUMP BY-PASS
For one pipe system factory setting (no plug).
PLUG
WIRING
Refer to wiring label and Figure – 4 for correct burner connections.
THERMOSTAT
Connect thermostat terminals.
2.7 CHANGING
NOZZLE
NOZZLE CHANGE
If a new nozzle of a different size is installed change the heating blower
speed according to the operating decal or section
3.0 BURNER
SPECIFICATIONS
.
2.8 SET BURNER FOR EFFICIENT OPERATION
SET END CONE
Use turbulator settings in section
3.0 BURNER SPECIFICATIONS
or
operating decal as a guide to set turbulator, particularly for nozzle
changes.
PUMP PRESSURE
Refer to section
3.0 BURNER SPECIFICATIONS
or operating decal.
AIR SETTING
Use air settings in section
3.0 BURNER SPECIFICATIONS
or operating
decal as a guide to set air damper.
SAMPLING HOLE
On smoke/vent pipe, between appliance breech and draft control, punch
or drill a 1/4” round opening. Not applicable to Direct Vent.
DRAFT PRESSURE
Using an accurate draft meter; adjust the draft control to obtain -0.03” wc
draft pressure at the breech sampling hole. Not applicable to Direct
Vent.