
3 6 0 E
X P R E S S
8–22
Freshwater Washdown
To operate the freshwater washdown, turn on the water pressure switch on the AC/DC switch
panel. This system will now be pressurized at the “freshwater” washdown outlet. A hose with
a spray nozzle attached may be used intermittently without turning the switch off in the same
fashion as a home garden hose with a nozzle. The freshwater pump has an internal
pressurization switch that will maintain water pressure as needed until the switch is turned off
at the switch panel.
Cockpit Switch Panel
This panel is located above the starboard rigging station. It is used to operate those systems
which are not included on the AC/DC panel or the helm switch panel. The switches are backlit
for low light situations and have individual breakers located above them. Refer to
“Switch
Panels” on page 8–2
for information regarding the operation of switches included on this
panel.
Helm Switch Panel
This panel is located at the helm, and is used to operate the livewell system, washdown
system, and spreader lights. The switches are backlit for low light situations and have
individual breakers located above them. Refer to
“Switch Panels” on page 8–2
for
information regarding the operation of switches included on this panel.
Head And Discharge Pump
Reference
“VacuFlush® Head System” on page 8–26
for information on the operation of
these components.
Head Shower
To use the head shower, the freshwater switch located on the AC/DC panel must be activated
or a shore water supply must be connected to provide pressure to the hot and cold water
supplies. Water flow is controlled by the shower mixer fixture and a conservation valve built
into the shower head.
Livewell – Raw Water
To operate the livewell, open the seacock with the livewell I.D. tag located beneath the center
lid in the aft berth. The 1100 gph (4164 lph) livewell pump is screwed directly into this
seacock. The livewell switch at the helm should be in the “on” position. Place the livewell
standpipe in the drain located at the bottom of the livewell. Screw it down until the black
flange makes contact with the flange on the drain fitting. Water will enter through a plenum
along the side of the livewell and be distributed through a series of holes arranged vertically
along the plenum. The water will rise to a depth even with the strainer on the standpipe and
Summary of Contents for EXPRESS 360
Page 2: ......
Page 8: ...T A B L E O F C O N T E N T S ...
Page 12: ...W E L C O M E 1 4 ...
Page 20: ...S A F E T Y 2 8 ...
Page 36: ...I N S T R U M E N T A T I O N A N D S W I T C H E S 5 8 ...
Page 58: ...M A I N T E N A N C E A N D S E R V I C E 6 16 ...
Page 66: ...W I N T E R I Z A T I O N A N D S T O R A G E 7 8 ...
Page 132: ...L I M I T E D W A R R A N T Y 9 4 ...
Page 135: ......
Page 136: ......