Setup
Setup
To avoid tip over, ensure cart is on a flat and level
surface. Failure to do so could result in injury or
equipment damage.
Tools Required:
• Two adjustable wrenches
• Non-sparking hammer or plastic mallet
• Torque wrench
1. Ground sprayer. See
Grounding, page 11
.
2. Check packing nut (F). Fill with Throat Seal
Liquid (TSL). Torque to 25-30 ft-lb (34-41 N•m).
3. Attach electrically conductive fluid hose to pump
outlet and tighten.
4. Attach electrically conductive fluid hose (and
air hose if using an AA gun) to gun and tighten.
Check that all pressure connections are tight.
5. Close bleed type master air valve (B). Connect
air supply hose to 1 in npt(f) air inlet (A).
6. Flush and prime before using. See
Flush, page 15
, and
Prime, page 17
.
334645B
13