Applying Material to a Surface
32
3A1319K
Double Bead Application
(ThermoLazer 300TC/ProMelt)
(Requires Installation of Double Bead Kit 24C528)
1. Fill element beads on left side (smaller chamber).
2. Fill glass beads on right side (larger chamber).
Close and lock hopper door. Do not allow beads to
remain in hopper, hoses or bead dispenser for an
extended period of time. Beads will absorb moisture,
bond to adjacent beads and harden.
Bead Dispenser Engagement Wheel
To properly dispense beads, drive wheel (27) must be in
direct contact with tire (89). If drive wheel (27) becomes
loose and/or starts to slip, use allen wrench to tighten
set screw (211).
Applying Material to a
Surface
1. Position unit over target area and push forward in a
straight line until front wheel locks into centered
position (a slight click will be heard when wheel is
engaged). Use Line Guide to help guide the unit.
2. Pull unit back to start of target area and move
screed box into position.
3. Pull thermoplastic ControlFlow Gate Valve Actuator
(S) and fill screed box with melted material.
4. Open valve actuator gate and fill screed box to a
level 1.5 in. (3.8 cm) from top.
5. Push screed box/bead dispenser box actuator (N)
forward to deploy screed box and engage bead dis-
pense wheel.
6. Push the unit forward with screed box deployed and
bead dispenser wheel engaged to apply material.
For examples of correct and incorrect material applica-
tion, see
Troubleshooting
section in Repair manual.