Installation
313431H
9
NOTE: Always use all 4 large flat washers with 4 bolts to
mount the hose reel pedestal to any surface.
All Models
Select the reel bank mounting location.
•
For high ceilings, suspend a suitable support
structure for the reels, so the hoses will be long
enough to reach your service area.
•
A reel bank mounted in a one-lift service bay
should be at least 6-ft (1.9m) from the center
line of the lift (F
. 6).
•
In a one-lift bay, mount the reel bank at least 6
feet (1.9 m) from the center line of the lift. In a
two-lift bay, mount the bank equal distance
between the lifts.
•
A bank of all motor oil reels should be mounted
about 5 ft (1.5m) from the center of the lift,
toward the front of the lift rails (F
. 6).
HR, HP or HS Models Only
1.
Determine the desired position of the roller support
arm (a) (F
IG
. 4).
•
The hose reel is factory-assembled and shipped
with the roller support arm (a) in position AA
(HR and HP Models) or EE (HS Models) (F
IG
.
4). If that position is desired, skip step 2.
2.
To reposition roller support arm to any other position
than the Ship Position (AA or EE):
•
HR and HP Model Reels
a. Secure spool against pedestal with C-Clamp.
b. Remove 4 nuts (b) and rotate arm to desired
position, BB, CC, DD, EE, or FF.
c.
Check pawl to make sure it is not wedged. See
•
HS Model Reels
a. Secure spool against pedestal with C-Clamp.
b. Remove 8 nuts (b) and 2 bolts (c) to rotate
arm to desired position, AA, BB, CC, DD, or
FF.
c.
Check pawl to make sure it is not wedged. See
. 5.
F
IG
. 4
ti12199a
a
CC
BB
b
*HP and HR Models Shipping Position
DD
EE
FF
AA*
**HS Models Shipping Position
a
**EE
FF
DD
AA
BB
CC
b
ti13394
c
Summary of Contents for SD Composite HR
Page 41: ...NOTES 313431H 41 NOTES...