11. Turn on the air compressor, air dryer, and
breathing air (if applicable).
12. For the first startup of new system, use the
transfer pumps to supply fluid to the system.
a. Check that all Setup
Setup
Setup steps are complete.
See
.
b. If
If
If an
an
an agitator
agitator
agitator is
is
is used
used
used, turn the
agitator on. See your agitator manual,
c. If
If
If you
you
you need
need
need to
to
to circulate
circulate
circulate fluid
fluid
fluid through
through
through the
the
the
system
system
system to preheat the drum supply, see
Circulation Through Reactor, page 37
.
If
If
If you
you
you need
need
need to
to
to circulate
circulate
circulate material
material
material through
through
through
the
the
the heated
heated
heated hose
hose
hose to
to
to the
the
the gun
gun
gun manifold
manifold
manifold,
see
Circulation Through Gun Manifold,
d. Turn both pressure relief/spray valves
(SA, SB) to spray
.
WWLL EE
e. Open the fluid inlet valves (XA and XB).
Check for leaks.
WWLL DD
Cross-contamination can result
in cured material in fluid lines
which could cause serious injury
or damage equipment. To prevent
cross-contamination:
• Never interchange component A and
component B wetted parts.
• Never use solvent on one side if it
has been contaminated from the
other side.
• Always provide two grounded waste
containers to keep component A and
component B fluids separate.
f.
Turn on the transfer pumps.
If
If
If you
you
you are
are
are using
using
using an
an
an electric
electric
electric transfer
transfer
transfer
pump:
pump:
pump: on the ADM screen, tap
to turn on the A-side transfer pump and
to turn on the B-side transfer
pump.
If
If
If you
you
you are
are
are using
using
using aa
a pneumatic
pneumatic
pneumatic transfer
transfer
transfer
pump:
pump:
pump: see your pump manual,
g. Hold the gun fluid manifold over two
grounded waste containers. Open fluid
valves A and B until clean, air-free fluid
comes from valves. Close valves.
The Fusion AP gun manifold is shown.
3A8500B
31