Setup/Startup
10
3A3393C Operation
Setup/Startup
1. Perform
Pressure Relief Procedure
, page 9.
2. Perform
Grounding Procedure (For Flammable
Flushing Fluids Only)
, page 9
if using flammable
materials.
3. Fill throat packing nut with Throat Seal Liquid (TSL)
to decrease packing wear.
4. Check engine oil level. Add SAE 10W-30 (summer)
or 5W-30 (winter). See engine manual.
5. Fill fuel tank.
6. Set pump valve(s) to
OFF (
250
SPS
has one pump
valve; 250
DC
has two pump valves).
7. If removed, install strainer(s).
8. Turn prime valve(s) down (250
SPS
has one prime
valve; 250
DC
has two prime valves). Turn pressure
control counterclockwise to lowest pressure.
NOTE:
Minimum hose size allowable for proper
sprayer operation is 3/8 in. x 11 ft (9.5mm x 3.3m).
9. Place siphon tube set(s) in grounded metal pail par-
tially filled with flushing fluid. Attach ground wire to
true earth ground. Use water to flush water-base
paint and mineral spirits to flush oil-base paint and
storage oil.
This equipment stays pressurized until pressure is
manually relieved. To help prevent serious injury
from pressurized fluid, such as skin injection, splash-
ing fluid and moving parts, follow the Pressure Relief
Procedure when you stop spraying and before clean-
ing, checking, or servicing the equipment.
ti33
0
7a
ti3308a
ti3309a
ti23
ti
3
4
3
0
a
ti6473a
ti3441a
PAINT
FLUSH
ti
33
10
a