Replace
Replace
Replace Flow
Flow
Flow Meter
Meter
Meter
NOTE:
NOTE:
NOTE: For H-30, H-40, and H-50 Elite models
only.
1. Perform
2. Perform
Pressure Relief Procedure, page 49
3. Disconnect the flow meter cable.
4. Disconnect the hose. Remove the flow
meter.
5. Install the new flow meter and reconnect the
hose.
Figure 6 : Flow Meter
6. Connect the flow meter cable.
7. Enter the k-factor on System Screen 3 on
the ADM. Refer to System
System
System 3
3
3 in your Reactor
operation manual.
Replace
Replace
Replace Pressure
Pressure
Pressure Transducers
Transducers
Transducers
1. Flush. See
.
2. See
.
3. Disconnect transducer cables (405) from #6
and #7 connectors on the HCM.
4. Remove wire ties constraining transducer
cable and remove cable from cabinet.
5. Install o-ring (406) on new transducer (405).
6. Install transducer in manifold. Mark end
of cable with tape (red=transducer A,
blue=transducer B).
7. Route new cable into cabinet and thread
into bundle as before. Attach cable ties to
bundle as before.
8. Connect A side pressure transducer cable
to HCM port #6. Connect B side pressure
transducer cable to HCM port #7.
62
334946J