Installation
332453A
3
Installation
Light Tower, 24R824
1.
Perform the
Shutdown
procedure in the Exact-
aBlend AGP Advanced Glazing Proportioner,
Setup-Operation manual.
2.
Remove the nut that secures the fluid plate.
3.
Fasten the light tower bracket to the boom assem-
bly. Torque the nut to 24 ft-lb (33 N•m).
4.
Mount the light tower to the bracket. Hand tighten
the light tower nut.
5.
Connect the cable from the light tower to port 3
located on the Fluid Control Module (FCM).