Location Requirements
•
Refer to
on page 47 for ram mounting
and clearance dimensions.
•
Install indoors only, and do not install near water or
any other liquid that is sprayed.
Location
The system should be lifted by the holes located on the
air motor bracket (J). Perform the following steps to lift
the supply system:
1. Remove the low level switch bar (T) from the left lift
hole on the air motor bracket (J)
2. Attach a lifting sling at the proper lift locations. Lift
off the pallet using a crane or a forklift.
3. Remove the lifting sling and replace the low level
switch bar (T) after the system has been lowered
into the desired location.
There are two options for the location of the supply sys-
tem:
Option #1:
Using the holes in the ram base as a guide, drill holes
for 5/16 in. (8 mm) anchors.
Ensure that the ram base is
level in all directions. If necessary, level the base using
metal shims. Secure the base to the floor using 5/16 in.
(8 mm) anchors that are long enough to prevent the ram
from tipping.
Option #2:
Use M10x1.5 hex screws (not supplied) in each corner
of the base plate to act as jack bolts to level the machine
frame.
All electrical wiring must be done by a qualified elec-
trician and comply with all local codes and regula-
tions.
The lifting tool can pinch or amputate fingers. When
raising and lowering the system, keep fingers and
hands away from the lifting location.
NOTICE
Always lift the supply system at the proper lift loca-
tions shown in F
. 5. Do
not
lift in any other way.
Lifting the system at any other location could result
in damage to the air motor.