Control Board Replacement
20
3A1181B
Installation
1.
Push grommet and power cord wires into strain
relief in control board (18).
2.
Connect power cord connectors to terminals indi-
cated on control board (18).
NOTE:
Route power cord (19) between coupled hose
(42) to filter manifold and sprayer frame.
3.
Slide control board into place on side of motor front
endbell.
4.
Replace three screws (11). Torque to 30-35 in-lb
(3.4-3.9 N.m).
5.
Connect motor connector (D) and pressure control
assembly connector (A).
6.
Install shroud (12) with two screws (4)
(see page
17)
.
7.
Hi-Boy Models Only -
Connect high-pressure hose
at pump outlet
(see page 14)
.
ti6122a
18
Grommet
Strain
Relief
120V
A
ti16079a
18
D
C
Bottom View of Sprayer
ti11555a
42
19
ti11553a
11
A
ti16079a
18
D
C
Summary of Contents for 24F561
Page 29: ...Notes 3A1181B 29 Notes...
Page 39: ...Notes 3A1181B 39 Notes...