Conversion Kit Installation
13
Install Linear Sensor
5.
Place the magnet bracket plate (9) on the left side of
the activator plate (21).
6.
Pass two socket head cap screws (10) through the
bottom two holes of magnet bracket plate (9) and
activator plate (21).
7.
Place the magnet bracket spacer (8) on top of the
activator plate (21).
8.
Pass the remaining two socket head cap screws
(10) through the top two holes of magnet bracket
plate (9) and the two holes in magnet bracket
spacer (8).
9.
Place the magnet mounting bracket (7) on the right
side of the activator plate (21), guiding the four
socket head cap screws (10) through the four holes
in the bracket.
10. Spin the four lock nuts (11) onto the ends of the four
socket head cap screws (10) and tighten.
11. Apply thread sealant to threads of magnet
holder (5).
12. Attach magnet holder (5) to the end of the magnet
mounting bracket (7) using nut (15).
13. Attach linear sensor bracket (6) to the left hydraulic
cylinder port block using two hex head cap
screws (12), flat washers (14), and split lock
washers (13).
14. Apply thread sealant to remaining nut (15)
15. Install linear sensor (4) in the linear sensor bracket
(6) using remaining nut (15).
16. Pass wiring harness from linear sensor (4) through
opening in top of electrical cabinet (DE).
17. Replace front cover (CA).
F
IG
. 6
12
13
14
12
13
14
4
6
15
5
15
7
11
10
9
8
21
ti11759a
The holes in the magnet bracket spacer (8) are
off-center. Make sure the side with more space
between the edge and holes faces down.
F
IG
. 7: Assembled View with Front Cover Removed
Linear Sensor
Assembly
ti11796a
Summary of Contents for 24A024
Page 30: ...Pressure Relief Procedure 30...