![background image](http://html1.mh-extra.com/html/graco/243348/243348_instructions-parts-list-manual_2252629006.webp)
6 309280
Installation
Preparing the Site
Ensure that you have an adequate compressed air
supply. Keep the site clear of any obstacles or debris
that could interfere with the installer’s and operator’s
movement.
Preparing to Install the System
Before installing the system:
D
See component manuals for specific data on com-
ponent requirements. Data presented here pertains
to the system only.
D
Have all system and subassembly documentation
available during installation.
D
Be sure that all non-Graco supplied hoses are
adequately sized and pressure-rated to meet the
system requirements.
D
Have all robot manufacturer’s instructions and
system documentation available for reference.
Initial Checkup and Startup
WARNING
PRESSURIZED EQUIPMENT HAZARD
To prevent the the risk of injury or equip-
ment damage, do not pressurize the sys-
tem until you have verified the system is
ready and it is safe to operate.
WARNING
PRESSURIZED FLUID HAZARD
To reduce risk of injury or equipment
damage:
D
Make sure all material hose con-
nections are secure.
D
Check that all routing of air lines
will not interfere with any moving
components within the fixture.
D
Do not pressurize the system until
you have verified the system is
ready and it is safe to do so.
1.
Check all material hoses and fittings to ensure
tightness to prevent any material leakage. Ensure
that Input and Output hoses are correctly con-
nected (See Fig.1).
1/4” O.D. tube
fitting air inlet
solenoid valve
Fig. 1
TI0853
Fluid Inlet
(on valve
body) 1/2 npt
(female)
Fluid Outlet
3/4” npt (female)
Servo Drive provided
by other manufactures
1/2” NPT Ports
for Temperature
Conditioning
2.
Check all system air lines and automatic gun
plumbing. Make sure that routing of all lines and
cables will not interfere with any moving compo-
nents with the fixture.
3.
Connect temperature conditioning water supply
line.
a.
Connect water supply line to either of the two
1/2” temperature conditioning ports.
b.
Connect water return line to second 1/2” port.
4.
Follow system instructions of supply equipment.
5.
Perform initial material loading and filling per
system instructions.