Installation
2
307727R
Installation
Install the wheels (5) and arms (16-right, 19-left) in the
arm guides. Extend the arms equally on each side of the
pan to fit the service pit tracks, But do not extend them
further than the inside end of the arm guides. Refer to
the Dimensional Drawing, page 3, for maximum
extensions. Torque bolts (6) into nuts (11) to 45-55 ft-lb
(62-75 N.m). (F
Kit No. 218970 (parts marks with *) is available for
connecting two carts together and draining one into the
other. See F
To drain oil from the pan, connect a suitable hose to the
1-1/2 npt(f) ball valve (8) and open the valve. Be sure to
close the valve before using the pan.
Parts
F
IG
. 1
5b**
6, 11
Torque to 45–55 ft–lb
(62–75 N m).
15
16
arm guides
5d**
5a**
5c**
19
8*
F
IG
. 2
21†
20*
8*
9*
13*
14
12
24