pg. 2
Welcome!
This quilting frame has been designed to be simple and practical for those new to machine quilting as
well as easy to assemble. We hope that you will enjoy quilting for a lifetime.
As you begin assembly of your new Start Right 2 frame, keep in mind the following:
•
The assembly will be simple and step by step;
•
Read through each step completely before beginning that step
•
Using the parts list as a reference, take the parts out of the box and make sure that you
have them all.
•
Identify your hardware packets: All hardware is separated by type and each packet is
labeled for ease in identification.
Warranty Information
for your Grace Machine Quilting Frame
The Machine Quilting Frame has a One-Year limited warranty on all parts. The Grace Company will
repair or replace, at its discretion, any part with manufacturing defects. This warranty does not cover
parts damaged through misuse, improper storage, improper assembly, loss, natural events, and willful
destruction. Parts must be returned to the Grace Company, shipping prepaid, before they can be
repaired or replaced. We will promptly return the repaired/replaced part at our expense within
a year of the purchase date.
Table of Contents
Part List
Part List .......................................................................................................................... 3
Assembly Steps
Step 1-Leg Assembly ....................................................................................................... 5
Step 2-Table Brace Assembly ............................................................................................ 6
Step 3-Frame End Left & Right Assembly .......................................................................... 7
Step 4-Tracks Assembly ................................................................................................... 7
Step 5-Rail Holder Bracket Assembly ................................................................................. 8
Step 6-Rails Assembly ...................................................................................................... 9
Step 7-Placing the Carriage ............................................................................................ 10
Step 8-Channel Lock Installation .................................................................................... 11
Step 9-Placing you Sewing Machine ................................................................................ 11
Step 10-Adjusting the Rail Holder Brackets ...................................................................... 13
Fabric Installation
Quilting Frame Fabric Installation ................................................................................... 14
Making Leader Clothes ................................................................................................... 15
Step 1-Installing Fabric Layers onto Rails ........................................................................ 15
Step 2-Attaching your Quilt Layers to the Take-Up Rail ..................................................... 16
Step 3-Attaching Bungee Clamps .................................................................................... 17
Step 4-Channel Lock Setup ............................................................................................ 17
Available Acessories .................................................................................................. 18
Summary of Contents for SR2+
Page 19: ...pg 19 ...