Gotec SA, Rue des Casernes 59, CH-1950 Sion –
Tél. +41(0)27 205 7 205 - Fax +41(0)27 205 7 206 - e-mail :
-
www.gotec.ch
- 19 -
4. OPERATION :
Pour water into air conditioner drain tank. Check that the pump starts then
stops when the water level has gone back down. To check the operation of the
alarm, continue to pour in water until the alarm triggers (cutting of the air
conditioner or generating an audible or visual alarm, etc.).
5. CLEANING :
Periodically: at the beginning of the season. Clean the detection unit.
Disconnect from main supply before opening. Remove the lid of the elbow to
reach the detection block. Remove the float, clean the detection unit and the
float using a solution of water containing 5% bleach. Replace the float in this
initial position, reinstall the lid. Carry out an operating test on the pump and the
alarm. When the air conditioner is installed in an area liable to cause or favour
extensive dirtying of the condensate water, maintain more frequently.
6. WARRANTY :
One (1) year as of date of delivery. This warranty concerns all parts with
material defects or manufacturing faults and is confined to the replacement or
repair of the defective parts. Cost of labour and any secondary failures cannot
be considered as basis for a claim in any case.
All returned equipment must be completed and accompanied by a note
indicating the observed fault.
We decline any responsibility if the installation is not in conformity, if
the specifications are not satisfied, if the equipment is not maintained
or if alarm is not connected.