B
A
C
5: DO NOT INSTALL LAG SCREWS AT THIS TIME.
1: PLACE THE 2 X 6 X 36-3/4" SANDBOX BOARD ON THE FRONT OF THE CORNER POSTS. THE HOLES IN THE
SANDBOX BOARD SHOULD BE OFFSET DOWN.
2: USE 5/16 X 4-1/2" HEX BOLTS AND 5/16" WASHERS TO ATTACH THE TOP HOLES OF THE SANDBOX BOARD TO THE
T-NUTS INSTALLED ON THE CORNER POSTS. THE BOTTOM HOLES WILL BE USED LATER.
3: PLACE THE 2 X 4 X 36-3/4" TOP PANEL BOARD ON THE FRONT OF THE CORNER POSTS.
4: USE 5/16 X 4-1/2" HEX BOLTS AND 5/16" WASHERS TO ATTACH THE HOLES OF THE TOP PANEL BOARD TO
THE T-NUTS INSTALLED ON THE CORNER POSTS.
D
STEP 5: FRONT FRAME ASSEMBLY
BOARD
HEX BOLT
5/16" WASHER
5/16 X 4-1/2"
(OFFSET DOWN)
SANDBOX BOARD
2 X 6 X 36-3/4"
TOP PANEL
2 X 4 X 36-3/4"
FRONT OF
TOWER
107
Summary of Contents for Pioneer Peak
Page 64: ...PART 2 CLATTER BRIDGE ASSEMBLY 102...
Page 94: ...APPENDIX 132...