STEP 25: REST SWING BEAM ON FORT
*TWO PEOPLE ARE REQUIRED FOR THIS STEP
1: LAY THE SWING BEAM ACROSS THE TOP OF THE FORT RAILINGS. THE END OF THE SWING BEAM WITH TWO EMPTY
HOLES SHOULD OVERHANG THE SIDE OF THE FORT WITH THE TRIANGULAR SWING BEAM PLATE.
2: SIT THE SWING BEAM LEGS UPRIGHT UNDER THE TWO EMPTY HOLES IN THE END OF THE SWING BEAM.
THESE TWO HOLE LOCATIONS WILL
BE EMPTY ON YOUR SWING BEAM.
LINE THEM UP WITH THE HOLES IN
THE SWING LEG BRACKET UNDER
THE SWING BEAM.
75
Summary of Contents for Pioneer Peak
Page 64: ...PART 2 CLATTER BRIDGE ASSEMBLY 102...
Page 94: ...APPENDIX 132...