STEP 1: ATTACHING T-NUTS TO THE CORNER POSTS

1: THIS STEP IS CRITICAL TO BUILDING THE FORT PROPERLY. IF ANY MISTAKES ARE MADE HERE, YOU WILL NEED TO

DIS-ASSEMBLE AND THEN RE-ASSEMBLE TO MAKE YOUR CORRECTIONS.

2: MAKE SURE HOLES ARE FREE OF ANY OBSTRUCTIONS. USE A BOLT TO CLEAN OUT ANY DEBRIS.

3: LAY OUT EACH OF THE 4 X 4 X 96" CORNER POSTS IN THE AREA YOU INTEND ON BUILDING THE FORT.

4: USE THE DIAGRAM BELOW TO CORRECTLY IDENTIFY AND ORIENT THE NECESSARY DIRECTION THE POSTS

SHOULD FACE.

5: USE A HAMMER TO SEAT THE T-NUTS AFTER INSERTING THEM INTO THE HOLES SHOWN IN THE DIAGRAM BELOW.

6: THE BARREL OF THE T-NUT SHOULD GO IN THE HOLE FIRST. HAMMER THE T-NUT UNTIL IT IS FLUSH/ALMOST FLUSH

TO THE CORNER POSTS.

39

Summary of Contents for Pioneer Peak

Page 1: ...ES ARE MADE HERE YOU WILL NEED TO DIS ASSEMBLE AND THEN RE ASSEMBLE TO MAKE YOUR CORRECTIONS 2 MAKE SURE HOLES ARE FREE OF ANY OBSTRUCTIONS USE A BOLT TO CLEAN OUT ANY DEBRIS 3 LAY OUT EACH OF THE 4 X...

Page 2: ...M HOLES WILL BE USED LATER 3 LAY THE 2 X 6 X 47 1 2 BOTTOM PANEL BOARD ON TOP OF THE RIGHT SIDE CORNER POSTS IN THE MIDDLE OF THE CORNER POSTS THE HOLES IN THE BOTTOM PANEL BOARD MUST BE OFFSET DOWN 4...

Page 3: ...T BE OFFSET DOWN 5 USE 5 16 X 4 1 2 HEX BOLTS AND 5 16 WASHERS TO ATTACH THE BOTTOM HOLES OF THE BOTTOM PANEL BOARD TO THE T NUTS INSTALLED ON THE CORNER POSTS THE TOP HOLES WILL BE USED LATER 6 LAY T...

Page 4: ...X 6 X 70 FRONT FACE BOARD STEP 3A DRILL HOLES FOR BRIDGE CHAINS 1 LOCATE ONE 2 X 4 X 70 DECK SUPPORT AND ONE 2 X 6 X 70 FRONT FACE BOARD 2 MEASURE AS SHOWN BELOW AND MAKE MARKS ON EACH BOARD 3 PLACE...

Page 5: ...ES FOR CLATTER BRIDGE CHAIN LEFT SIDE OF PLAY SET STEP 4 DECK SUPPORTS YOU WILL NEED AN EXTRA PERSON FOR THIS STEP 1 WITH HELP STAND UP THE LEFT AND RIGHT SIDE ASSEMBLIES 2 FASTEN THE 2 X 4 X 70 DECK...

Page 6: ...NSTALLED ON THE CORNER POSTS THE BOTTOM HOLES WILL BE USED LATER 3 PLACE THE 2 X 6 X 70 FRONT FACE BOARD WITH NOTCHES ON THE FRONT OF THE CORNER POSTS THE HOLES IN THE FRONT FACE BOARD SHOULD BE OFFSE...

Page 7: ...T BE OFFSET UP 4 USE 5 16 X 4 1 2 HEX BOLTS AND 5 16 WASHERS TO ATTACH THE TOP HOLES OF THE BOTTOM PANEL BOARD TO THE T NUTS INSTALLED ON THE CORNER POSTS THE BOTTOM HOLES WILL BE USED LATER 5 PLACE T...

Page 8: ...RING PROCESS 2 PLACE THE FRAME IN ITS FINAL POSITION AND FOLLOW THE PROCEDURES AT THE FRONT OF THE MANUAL TO LEVEL AND SQUARE THE STRUCTURE HAVE AN ASSISTANT HELP YOU LIFT THE FRAME AS REQUIRED DO NOT...

Page 9: ...SIDES OF THE PLAY SET TO THE 2 X 6 BOTTOM PANEL BOARDS THE TOP OF THE ANGLE SUPPORT SHOULD BE FLUSH OR LOWER THAN THE TOP OF THE DECK SUPPORT 2 AT THE TOP USE 2 1 2 WOOD SCREWS THROUGH THE DECK SUPPOR...

Page 10: ...OFFSET HOLES UP AND 2 PLACE THE 2 X 4 X 14 BOTTOM PANEL BOARD ON TOP OF THE 2 X 6 PANEL BOARD AND FASTEN TO THE CORNER POSTS WITH 5 16 X 3 1 2 LAG SCREWS WITH 5 16 WASHERS OFFSET HOLES UP LAG SCREW 5...

Page 11: ...EN THE FRONT FACE BOARD AND BOTTOM PANEL BOARD DO THE FOLLOWING 1 LOOSEN UP THE BOARDS ON THE LEFT AND RIGHT SIDES OF THE PLAY SET REMOVE THE SCREWS ON ONE SIDE OF EACH DECK SPACER 2 ALLOW THE DECK BO...

Page 12: ...T INSTALLATION DAMAGE PRE DRILL 2 PLACE THE 5 4 X 4 X 40 3 8 DECK SPACER AT ONE END OF THE FORT CENTER THE BOARD BETWEEN THE CORNER POSTS AND ATTACH IT WITH 2 WOOD SCREWS THROUGH THE PREDRILLED HOLES...

Page 13: ...A MARK ON THE OUTSIDE OF THE FORT TO REPRESENT A CENTER LINE 3 USE 2 WOOD SCREWS TO ATTACH THE DECK SPACERS TO THE CENTER DECK SUPPORT 4 CENTER THE 2 X 4 X 70 CENTER DECK SUPPORT ON THESE MARKS AND PU...

Page 14: ...CK SUPPORT BELOW LEAVE A UNIFORM APPROX 1 4 SPACE BETWEEN THE DECK BOARDS NOTE THE TOP OF THE SCREW HEAD SHOULD BE FLUSH TO THE TOP OF THE DECK BOARDS FRONT FACE BOARD AND THE REAR BOTTOM PANEL BOARD...

Page 15: ...EP 11 ROCK WALL 1 FIND TWO 2 X 4 X 66 ROCK WALL SIDES 2 POSITION THE ROCK WALL SIDES SO THAT THE HOLES IN THE BOARDS ARE BOTH FACING THE SAME WAY 3 INSERT T NUTS INTO THE INSIDE OF THE ROCK WALL SIDES...

Page 16: ...TENING EACH BOARD WITH TWO 2 WOOD SCREWS ON EACH END 4 THE FINAL BOARD WILL BE THE BOTTOM ROCK WALL BOARD WITH ONE HOLE ATTACH WITH TWO 2 WOOD SCREWS PER SIDE 5 IN SOME CASES THERE WILL BE EXCESS LENG...

Page 17: ...1 FASTEN THE 90 GREEN BRACKET TO THE ROCK WALL SIDES WITH 5 16 X 1 1 2 HEX BOLTS AND 5 16 WASHERS 2 DO NOT FULLY TIGHTEN THE HEX BOLTS INTO THE T NUTS AT THIS TIME 5 16 WASHER GREEN BRACKET 90 5 16 X...

Page 18: ...PAN HEAD SCREWS WITH WASHERS 2 MOUNT THE ROCKS IN A STAGGERED MANNER ON THE ROCK WALL BOARDS THREE PAN HEAD SCREWS AND WASHERS WILL SECURE EACH ROCK TO THE WALL NOTE THE IMAGE SHOWN BELOW IS A GENERI...

Page 19: ...OF THE FRONT FACE BOARD USING THE 90 GREEN BRACKETS AS A TEMPLATE DRILL A 3 8 HOLE THROUGH THE BOTTOM PANEL BOARD 2 GO UNDERNEATH THE DECK TO INSERT A T NUT INTO THE BACKSIDE OF THE 3 8 HOLES IN THE F...

Page 20: ...UPPORT BOARD AT THE SQUARE END OF THE 2 X 4 X 96 RAMP SIDE BOARDS OFFSET THE BOARD 1 FROM THE END FASTEN THE RAMP SUPPORT BOARD TO THE RAMP SIDE BOARDS WITH TWO 2 1 2 WOOD SCREWS PER SIDE 3 SECOND PLA...

Page 21: ...IDE ON A FIRM SURFACE THEN HAMMER IN THE 5 16 T NUTS REPEAT FOR THE OTHER 5 16 T NUT STEP 16A CLIMBING RAMP 1 PLACE THE RAMP SIDE ON A FIRM LEVEL SURFACE HAMMER A 5 16 T NUT INTO EACH HOLE ON THE INSI...

Page 22: ...2 1 2 WOOD SCREWS PER RAMP SUPPORT 3 ABOVE EACH OF THE RAMP SUPPORTS PLACE ONE 2 1 2 WOOD SCREW THROUGH THE RAMP SIDE BOARDS INTO THE 2 X 6 FLOOR BOARDS BETWEEN EACH RAMP SUPPORT INSTALL TWO MORE 2 1...

Page 23: ...HAT DOES NOT HAVE THE COUNTERBORED HOLE 2 SCREW A 3 8 EYE BOLT WITH A WASHER INTO THE T NUT SO IT LOOKS LIKE THE BOTTOM PICTURE DO NOT TIGHTEN THE EYE BOLT SO TIGHTLY THAT IT CRACKS THE WOOD JUST SNUG...

Page 24: ...D OF THE FLOOR SUPPORT BOARDS STEP 18 CLIMBING RAMP 1 ATTACH THE 2 X 2 X 16 FLOOR SUPPORT BOARDS TO THE FLOOR BOARDS WITH 2 1 2 WOOD SCREWS SEE DETAIL VIEW BELOW 2 FASTEN THE 90 GREEN BRACKET TO THE R...

Page 25: ...THE EYE BOLTS SHOULD BE ON THE OUTSIDE OF THE RAMP POSTS 2 SQUARE THE RAMP POST TO THE RAMP SIDE AND DRIVE IN TWO 2 1 2 WOOD SCREWS TO SECURE IT RAMP POST EYE BOLTS ON OUTSIDE OF RAMP POSTS RAMP SIDE...

Page 26: ...N HEAD SQUARE DRIVE SCREWS STEP 18B CLIMBING RAMP 1 FASTEN A BRACKET AS SHOWN UNDERNEATH THE RAMP TO THE RAMP POST AND THE RAMP SUPPORT 2 USE 8 X 1 1 4 PAN HEAD SQUARE DRIVE SCREWS TO ATTACH THE BRACK...

Page 27: ...T 4 ATTACH THE TOP OF THE RAMP POST SUPPORT TO THE RAMP POST WITH ONE 8 X 2 1 2 WOOD SCREW AND ONE 8 X 3 1 2 WOOD SCREW 5 ATTACH THE BOTTOM OF THE RAMP POST SUPPORT TO THE RAMP SIDE WITH FOUR 8 X 2 1...

Page 28: ...1 1 2 ABOVE THE BOTTOM OF THE BOTTOM PANEL BOARD USING THE BRACKETS AS A TEMPLATE DRILL A 3 8 HOLE THROUGH THE BOTTOM PANEL BOARD 2 FROM THE UNDERSIDE OF THE DECK INSERT A T NUT INTO THE BACKSIDE OF...

Page 29: ...OLES AS A GUIDE THEN ATTACH THE MOUNTS WITH 5 16 X 2 1 2 LAG SCREWS WITH WASHERS DO NOT OVER TIGHTEN 2 USE THE HOLES AS A GUIDE TO DRILL 3 8 DIAMETER HOLES THROUGH THE ROPE LADDER SUPPORT DRILL CAREFU...

Page 30: ...SIDE NOW THREAD IT THROUGH THE EYE BOLT NOW THREAD IT THROUGH THE HOLE IN THE ROPE MOUNT ON THE ROPE LADDER SUPPORT REPEAT THIS PROCESS FOR THE OTHER ROPE ON THE OTHER SIDE OF THE RAMP 3 TO MAKE THE R...

Page 31: ...TER POST TO THE RAILING WITH A 5 16 X 2 1 2 HEX BOLT AND A 5 16 WASHER AT THE TOP SQUARE THE CENTER POST TO THE DECK AND SECURE THE BOTTOM OF THE CENTER POST TO THE BOTTOM PANEL BOARD WITH 8 X 2 1 2 W...

Page 32: ...IONS VIEW FROM OUTSIDE THE PLAY SET ROCK WALL PANEL PANEL SLAT 5 4 X 2 5 8 X 28 1 4 SCREW 2 WOOD LEAVE THIS SLAT OFF UNTIL AFTER INSTALLING THE TIRE SWING BEAM ONCE THE TIRE SWING BEAM IS IN PLACE SEC...

Page 33: ...RP BOARDS 1 LOCATE THREE 2 X 4 X 47 3 8 TARP BOARDS 2 ATTACH EACH TARP BOARD TO THE TOP OF THE CENTER TARP SUPPORT OR THE CORNER POSTS WITH 8 X 2 1 2 WOOD SCREWS 2 X 4 X 47 3 8 TARP BOARD 8 X 2 1 2 WO...

Page 34: ...HOLES 2 FASTEN THE SWING BEAM PLATE TO THE SWING BEAM SUPPORT USING 3 1 2 CARRIAGE BOLTS ON TOP AND 3 8 LOCK NUTS WITH 3 8 WASHERS FROM UNDERNEATH IN THE COUNTER SUNK HOLESOF THE SWING BEAM SUPPORT US...

Page 35: ...DE UP THE SWING HANGERS WILL BE ON THE BOTTOM 2 FASTEN EACH SWING HANGER TO THE SWING BEAM USING 7 CARRIAGE BOLTS WITH TORQUE WASHERS AND 3 8 WASHERS WITH 3 8 LOCK NUTS 3 PLACE BOLT CAPS OVER EXPOSED...

Page 36: ...H SWING LEGS TO BRACKET 2 FASTEN THE SWING LEGS TO THE SWING LEG BRACKET WITH 3 8 X 3 1 2 LAG SCREWS AND 3 8 WASHERS 1 PLACE THE 4 X 4 X 108 SWING LEGS FLUSH TO THE TOP OF THE SWING LEG BRACKET 4 X 4...

Page 37: ...F THE SWING BEAM WITH TWO EMPTY HOLES SHOULD OVERHANG THE SIDE OF THE FORT WITH THE TRIANGULAR SWING BEAM PLATE 2 SIT THE SWING BEAM LEGS UPRIGHT UNDER THE TWO EMPTY HOLES IN THE END OF THE SWING BEAM...

Page 38: ...3 8 LOCK NUTS WITH 3 8 WASHERS FROM UNDERNEATH 2 USE A 3 8 X 3 1 2 LAG SCREW WITH 3 8 WASHER FOR THE HOLE IN THE CENTER OF THE SWING BEAM BRACKET 3 PLACE A BOLT CAP OVER ANY EXPOSED THREADS STEP 26 MO...

Page 39: ...FASTEN THE SWING BEAM TO THE SWING BEAM PLATE AND THE SWING BEAM SUPPORT USING A 9 CARRIAGE BOLT WITH A TORQUE WASHER AND A 3 8 LOCK NUT WITH A 3 8 WASHER ON THE BOTTOM PLACE GREEN BOLT CAPS OVER EXPO...

Page 40: ...VEL STEP 28 LEVEL SWING BEAM IMPORTANT NOTE THE LEGS ARE DESIGNED TO ACCOMODATE SWING BEAMS ON UNEVEN GROUND DOWN SLOPE THE LEGS ARE LONGER THAN REQUIRED IF YOUR GROUND IS RELATIVELY LEVEL YOU MAY EIT...

Page 41: ...58 SWING LEG CROSS MEMBER AGAINST THE SWING BEAM LEGS 2 LEVEL CROSS MEMBER AND MARK THE LOCATION OF THE SECURING HOLES INSIDE THE CROSS MEMBER HOLES 3 USE 3 8 X 3 1 2 LAG SCREWS WITH 3 8 WASHERS TO S...

Page 42: ...N THE GROMMETS UNDER THE TARP BOARD WITH 14 X 1 1 4 PAN HEAD SCREWS WITH 1 4 WASHERS REPEAT FOR OTHER SIDE NOTE IF YOU WISH YOU MAY PREDRILL HOLES FOR THE PAN HEAD SCREWS WITH A 1 8 DRILL BIT NOTE IF...

Page 43: ...NG CLIP SWING CHAIN STEP 31 HANGING THE SWINGS 1 START BY ATTACHING ONE SPRING CLIP TO EACH IRON DUCTILE ON THE SWING BEAM 2 ATTACH ONE CHAIN PER ACCESSORY TO EACH SPRING CLIP 3 ADJUST HEIGHT AS NEEDE...

Page 44: ...OF THE CORNER POSTS ON THE LEFT SIDE OF THE FORT MARK THESE POSITIONS ON THE OUTSIDE OF THE CORNER POSTS ATTACH THE 2 X 4 X 47 1 2 SAFETY BOARD WITH HOLES OFFSET UP OR DOWN YOUR CHOICE TO THE CORNER P...

Page 45: ...HER PLACE A 2 X 4 X 32 1 2 PT LEG ON TOP AT THE 7 1 2 DIMENSION THE TOP OF THE PT LEG SHOULD BE FLUSH TO THE TOP OF THE PT TOP SUPPORT ATTACH THE PT LEG TO THE SUPPORTS WITH 8 X 2 1 2 WOOD SCREWS 4 PL...

Page 46: ...MARK ON THE RIGHT FRONT CORNER POST ATTACH THE RIGHT SIDE ASSEMBLY TO THE INSIDE OF THE CORNER POST WITH 8 X 3 WOOD SCREWS 3 PLACE THE TOP OF THE LEFT SIDE ASSEMBLY FLUSH TO THE MARK ON THE RIGHT REAR...

Page 47: ...X 43 PT TOP AND SEAT BOARDS 2 CENTER THE HOLES IN THE BOARDS OVER THE TOP OR SEAT SUPPORTS 3 FASTEN THE PT TOP AND SEAT BOARDS TO THE TOP OR SEAT SUPPORTS WITH 8 X 2 1 2 WOOD SCREWS 8 X 2 1 2 WOOD SC...

Page 48: ...TO THE TOP OF THE SWING LEG BRACKET 2 FASTEN THE TIRE SWING LEGS TO THE SWING LEG BRACKET WITH 3 8 X 3 1 2 LAG SCREWS AND 3 8 WASHERS 3 8 WASHER LAG SCREW SWING LEG BRACKET 3 8 X 3 1 2 4 X 4 X 72 TIRE...

Page 49: ...BOLT 1 LINE UP THE HOLES OF THE TIRE SWIVEL WITH THE HOLES IN THE TIRE SWING BEAM 2 FASTEN THE TIRE SWIVEL TO THE TIRE SWING BEAM USING 3 8 X 7 CARRIAGE BOLTS WITH TORQUE WASHERS AND 3 8 WASHERS WITH...

Page 50: ...ASHERS ON TOP OF THE TIRE SWING BEAM AND 3 8 LOCK NUTS WITH 3 8 WASHERS FROM UNDERNEATH PLACE A BOLT CAP OVER ANY EXPOSED THREADS 2 USE A 3 8 X 3 1 2 LAG SCREW WITH 3 8 WASHER FOR THE HOLE IN THE CENT...

Page 51: ...GRADE ALSO SEE STEP 48 AN EXTRA PERSON IS NEEDED FOR THIS STEP 1 SIT THE SWING BEAM LEGS UPRIGHT 2 TAKE THE ASSEMBLED TIRE SWING BEAM AND LEGS AND INSERT THE SWING BEAM INTO THE GAP BETWEEN THE BACK R...

Page 52: ...BEAM TO THE CORNER POST USING 5 16 X 7 HEX BOLTS WITH 5 16 AND 1 2 WASHERS THROUGH THE TIRE SWING BEAM AND CORNER POST INTO THE T NUTS 4 AFTER THE TIRE SWING BEAM HAS BEEN SECURED INSTALL THE 5 4 X 3...

Page 53: ...AM LEVEL STEP LEVEL TIRE SWING BEAM IMPORTANT NOTE THE LEGS ARE DESIGNED TO ACCOMODATE SWING BEAMS ON UNEVEN GROUND DOWN SLOPE THEY ARE LONGER THAN REQUIRED IF YOUR GROUND IS RELATIVELY LEVEL YOU MAY...

Page 54: ...ON THE 2 X 4 X 47 1 2 TIRE SWING LEG CROSS MEMBER AGAINST THE SWING LEGS 2 LEVEL THE TIRE SWING CROSS MEMBER AND MARK THE LOCATION OF THE SECURING HOLES INSIDE THE CROSS MEMBER HOLES ONTO THE SWING LE...

Page 55: ...HANGING THE TIRE SWING 1 START BY ATTACHING THREE SPRING CLIPS TO THE TIRE SWIVEL ON THE SWING BEAM 2 ATTACH ONE CHAIN AT A TIME TO ONE SPRING CLIP 3 ADJUST HEIGHT AS NEEDED SPRING CLIP TIRE SWING CHA...

Page 56: ...E THROUGH THE HOLES IN THE ROPE LADDER RUNNER AND TIE THEM OFF GRAB EACH ROPE AND ATTEMPT TO WRAP IT AROUND YOUR HAND IF THE ROPE WRAPS AROUND YOUR HAND IT IS TOO LOOSE IF THE ROPE IS TOO LOOSE UNTIE...

Page 57: ...BAG FASTEN ONE OF THE SQUARE TELESCOPE BRACKETS TO THE FRONT TOP PANEL BOARD ON THE SLIDE SIDE OF THE CENTER POST 2 PLACE THE TELESCOPE STAND AND TELESCOPE INTO THE SLOT OF THE TELESCOPE BRACKET 3 FAS...

Page 58: ...BAG 2 ADJUST THE SAFETY HANDLES UP OR DOWN TO SUIT THE NEEDS OF YOUR CHILD 3 ATTACH EACH SAFETY HANDLE TO THE PANEL SLATS WITH TWO PAN HEAD SCREWS AND TWO WASHERS PROVIDED WITH THE SAFETY HANDLES 14 X...

Page 59: ...T 3 THE UNTIED END WILL GO THROUGH THE HOLE OF THE BOTTOM ROCK WALL BOARD TIE A SECURE KNOT AT THE END MAKING SURE THAT THE ROPE IS TIGHT AND WILL NOT WRAP AROUND YOUR HAND HINT TO REDUCE THE AMOUNT O...

Page 60: ...1 PLACE A FLAGON THE CORNER POSTS AT THE FRONT OF THE FORT 2 ATTACH THE BASE OF THE FLAG WITH THE 1 2 PHILLIPS HEAD SCREWS PROVIDED DO NOT OVER TIGHTEN STEP 44 FLAG KIT FLAG 1 2 PHILLIPS HEAD SCREW 98...

Page 61: ...WN BELOW 2 ATTACH THE SANDBOX SEATS TO THE SANDBOX BOARDS WITH 8 X 2 WOOD SCREWS 3 LOCATE THE NAME PLATE FOR YOUR PLAY SET ATTACH THE NAME PLATE TO THE FRONT OF THE SWING BEAM WITH 8 X 1 WOOD SCREWS A...

Page 62: ...GAINST YOUR HAND IF THE TOP PART OF THE STAKE TWISTS WHEN IT ENCOUNTERS A ROCK OR ROOT YOU MAY HAVE TO BEND THE TOP PORTION OF THE STAKE AGAINST THE SWING LEG FINALLY INSTALL THE SCREW AND WASHER 2 AT...

Page 63: ...HE CENTER OF THE T NUT DRILL THE HOLE 2 DEEP 3 PLACE THE STEERING WHEEL INSERT INSIDE THE STEERING WHEEL 4 USE THE 2 1 2 LAG SCREW AND WASHER TO FASTEN THE STEERING WHEEL TO THE REAR CENTER POST DO NO...

Page 64: ...PART 2 CLATTER BRIDGE ASSEMBLY 102...

Page 65: ...IS 3 LAY OUT EACH OF THE 4 X 4 X 96 CORNER POSTS IN THE AREA YOU INTEND ON BUILDING THE TOWER OF THE CLATTER BRIDGE 4 USE THE DIAGRAM BELOW TO CORRECTLY IDENTIFY AND ORIENT THE NECESSARY DIRECTION THE...

Page 66: ...THE SANDBOX BOARD TO THE T NUTS INSTALLED ON THE CORNER POSTS THE BOTTOM HOLES WILL BE USED LATER 3 LAY THE 2 X 4 X 36 3 4 TOP PANEL BOARD ON TOP OF THE RIGHT SIDE CORNER POSTS 4 USE 5 16 X 4 1 2 HEX...

Page 67: ...SIDE CORNER POSTS IN THE MIDDLE OF THE CORNER POSTS THE COUNTERSUNK HOLES IN THE BOTTOM PANEL BOARD MUST BE OFFSET UP 4 USE 5 16 X 4 1 2 HEX BOLTS AND 5 16 WASHERS TO ATTACH THE TOP HOLES OF THE BOTTO...

Page 68: ...ASSEMBLIES 2 FASTEN THE 2 X 4 X 36 3 4 DECK SUPPORTS TO THE HOLES AT 54 1 2 WITH 5 16 X 4 1 2 HEX BOLTS AND 5 16 D STEP 4 DECK SUPPORTS LEFT SIDE DECK SUPPORT HEX BOLT 5 16 X 4 1 2 FRONT OF TOWER FRA...

Page 69: ...DBOX BOARD TO THE T NUTS INSTALLED ON THE CORNER POSTS THE BOTTOM HOLES WILL BE USED LATER 3 PLACE THE 2 X 4 X 36 3 4 TOP PANEL BOARD ON THE FRONT OF THE CORNER POSTS 4 USE 5 16 X 4 1 2 HEX BOLTS AND...

Page 70: ...THE SANDBOX BOARD SHOULD BE OFFSET DOWN 2 USE 5 16 X 4 1 2 HEX BOLTS AND 5 16 WASHERS TO ATTACH THE TOP HOLES OF THE SANDBOX BOARD TO THE T NUTS INSTALLED ON THE CORNER POSTS THE BOTTOM HOLES WILL BE...

Page 71: ...ECK OF THE TOWER TO THE DECK OF THE FORT PLACE A DECK BOARD ACROSS THE 2 X 4 S THEN PLACE A 2 X 4 X 66 BRIDGE RAIL ON TOP OF THE DECK BOARD AND ON TOP OF THE FORT DECK PLACE A LEVEL ON TOP OF THE 66 B...

Page 72: ...5 4 X 4 X 29 3 8 DECK SPACERS BETWEEN THE CORNER POSTS MAKE EACH DECK SPACER FLUSH TO THE INSIDE SURFACE OF THE 2 X 6 OR THE OUTSIDE SURFACE OF THE CORNER POSTS DO NOT ATTACH THE DECK SPACERS YET 5 4...

Page 73: ...OTTOM PANEL BOARD SHOULD FLUSH TO THE TOP OF THE DECK 3 FASTEN THE BOTTOM PANEL BOARD TO THE CORNER POSTS WITH 5 16 X 3 1 2 LAG SCREWS WITH 5 16 WASHERS LEAVE THE LAG SCREWS LOOSE UNTIL THE NEXT STEP...

Page 74: ...4 TIGHTEN THE FASTENERS IN THE 2 X 6 AT THE FRONT OF THE TOWER AND IN THE BOTTOM PANEL BOARD WITH HOLES 5 TIGHTEN THE FASTENERS IN THE 2 X 6 ON THE LEFT SIDE OF THE TOWER 6 PLACE THE 2 X 4 X 36 3 4 B...

Page 75: ...ECK BOARDS TO THE DECK SUPPORTS WITH 2 WOOD SCREWS B C STEP 11 DECK 1 INSTALL THE 5 4 X 4 X 36 1 2 DECK BOARDS LEAVE A UNIFORM APPROXIMATELY 1 4 SPACE BETWEEN THE D 5 4 X 4 X 36 1 2 FRONT OF TOWER DEC...

Page 76: ...EL SLATS 2 IF THE SLATS ARE NOT ALREADY PRE DRILLED THEN PRE DRILL THE PANEL SLATS 1 FROM EACH END ON CENTER WITH A 1 8 DRILL BIT SEE TOP LEFT PICTURE BELOW 3 ON THE LEFT SIDE OF THE TOWER INSTALL TWO...

Page 77: ...TIC TAC TOE MOUNTS 4 USE THE SCREWS INCLUDED WITH THE TIC TAC TOE TO ATTACH THE GREEN BRACKETS TO THE TIC TAC TOE MOUNTS EACH GREEN BRACKET SHOULD BE CENTERED OVER THE TIE TAC TOE MOUNT STEP 13 TIC T...

Page 78: ...THE LEFT SIDE OF THE TOWER ON THE INSIDE THE TIC TAC TOE SHOULD BE APPROXIMATELY 3 OFF THE DECK 2 ATTACH THE TIC TAC TOE MOUNTS TO THE PANEL SLATS WITH 8 X 1 3 4 WOOD SCREWS 8 X 1 3 4 WOOD SCREWS PAN...

Page 79: ...E RAIL TO THE CORNER POST WITH 5 16 X 3 1 2 LAG SCREWS WITH 5 16 WASHERS 2 MEASURE 16 FROM THE TOP OF EACH BRIDGE RAIL AND MAKE A PENCIL MARK ON THE INSIDE OF THE CORNER POSTS 3 PLACE THE BOTTOM OF EA...

Page 80: ...TS WITH 5 16 X 3 1 2 LAG SCREWS AND 5 16 WASHERS 3 ATTACH EACH LOWER BRIDGE RAIL TO THE CORNER POSTS USING THE 16 DIMENSION AT THE FORT AS SHOWN ON STEP 15 AND BELOW ATTACH EACH LOWER BRIDGE RAIL WITH...

Page 81: ...RAIL SLATS 3 FROM THE FACE OF THE CORNER POSTS AND ATTACH WITH 2 WOOD SCREWS THE SLATS WILL MOUNT ON THE OUTSIDE OF THE BRIDGE RAILS 3 ATTACH THE REMAINING SLATS TO THE UNIT WITH 3 SPACING BETWEEN TH...

Page 82: ...USE A HAMMER TO SEAT THE T NUTS INTO THE BOARDS 2 FLIP ALL 15 BRIDGE DECK BOARDS OVER SO THAT THE FLANGE OF THE T NUT IS FACING DOWN LAY THE BRIDGE DECK BOARDS OUT ON A FLAT SURFACE AS SHOWN BELOW ST...

Page 83: ...DECK BOARD 96 CHAIN SECTIONS B 1 LOCATE TWO 96 CHAIN SECTIONS THAT SHIPPED WITH THE CLATTER BRIDGE 2 PLACE THE CHAINS OVER THE HOLES IN THE BRIDGE DECK BOARDS AS SHOWN BELOW 3 LINE UP THE 18TH LINK IN...

Page 84: ...BETWEEN THE BOLTS 4 PLACE A 5 16 X 1 3 4 HEX BOLT WITH 5 16 WASHER THROUGH THE CHAIN LINK THEN THROUGH THE 5 16 WASHER THEN THROUGH THE HOLE IN THE BRIDGE DECK BOARD AND SCREW IT INTO THE T NUT TIGHT...

Page 85: ...CORRECT GAP GO UNDERNEATH THE TOWER DECK AND USE A QUICK PANEL BOARD ON THE TOWER THIS MEANS THAT YOU WILL HAVE TO CONNECT THE ENDS OF THE CHAINS STEP 21 BRIDGE DECK CHAIN INSTALLATION LINK TO ATTACH...

Page 86: ...TACH THE VERTICAL TARP SUPPORTS TO THE TOP PANEL BOARDS WITH 2 1 2 WOOD SCREWS 1 PLACE THE 2 X 4 X 33 VERTICAL TARP SUPPORTS ON THE INSIDE OF THE TOP PANEL BOARDS THE END OF EACH VERTICAL TARP SUPPORT...

Page 87: ...TARP BOARD SHOULD BE FLUSH WITH THE SIDES OF THE VERTICAL TARPS SUPPORTS 3 ATTACH THE TARP BOARD TO THE VERTICAL TARP SUPPORTS WITH 2 1 2 WOOD SCREWS 4 PLACE ONE TARP BOARD ON TOP OF THE CORNER POSTS...

Page 88: ...THE TARP OVER THE TOP OF THE TARP BOARD ON TOP OF THE VERTICAL TARP SUPPORTS THE HEMS SHOULD FACE THE INSIDE 3 THE TARP WILL OVERLAP THE SIDE OF THE TARP BOARDS ON TOP OF THE CORNER POSTS 4 ATTACH THE...

Page 89: ...AND 5 PLACE THE STEPS INTO THE SLOTS ON THE PUT THE SCREWS INTO THE OTHER SIDE ANGLE BRACKETS TO THE INSIDE OF THE LADDER RAILS WITH 5 16 X 1 1 2 BOLTS 5 16 WASHERS INTO THE 5 16 T NUTS LADDER SIDES A...

Page 90: ...STEP 26 MOUNTING THE LADDER 1 PLACE THE TOP OF THE BRACKETS 1 1 2 DOWN FROM THE TOP OF THE 2 X 6 2 CENTER THE LADDER SIDE TO SIDE 3 MARK THROUGH EACH BRACKET ONTO THE 2 X 6 4 DRILL 3 8 HOLES AT EACH...

Page 91: ...SAFETY HANDLES 1 PLACE A PLASTIC SAFETY HANDLE ON EACH CORNER POST ABOVE THE LADDER 2 ADJUST THE SAFETY HANDLE UP OR DOWN TO SUIT THE NEEDS OF YOUR CHILD 3 FASTEN EACH SAFETY HANDLE WITH THE 1 4 FLAT...

Page 92: ...SLIDE ON THE DECK WITH THE LIP EXTENDING ONTO THE DECK SPACER 2 PREDRILL 1 8 HOLES INTO THE DECK SPACER AT THE SCREW LOCATIONS 3 ATTACH THE SLIDE TO THE DECK SPACER WITH 1 1 4 PAN HEAD SCREWS DO NOT...

Page 93: ...RIDGE RAILS STEP 29 PANEL SLAT 1 PLACE THE 5 4 X 3 X 28 1 4 PANEL SLAT FLUSH TO THE SIDE OF THE BRIDGE RAILS AS SHOWN BELOW 2 ATTACH THE PANEL SLAT TO THE ROPE LADDER SUPPORT AND FRONT FACE BOARD ON T...

Page 94: ...APPENDIX 132...

Page 95: ...4 Repeat substeps 1 through 3 for the mesh panel on the lower bridge rail on the opposite side 2 The recessed area in the grommet will receive the washer Place a pan head screw through a washer TWO F...

Page 96: ...ign the edge of the mesh border with the end of the go from the center grommet to the other side and do the same from the center grommet to one end of the mesh and repeat the mark drill install fasten...

Page 97: ...ced on the front center post as well as the rear center 1 Center the Canopy Accent over the front or rear center post The top of the Canopy Accent should be flush to the top of the center tarp board 2...