
5/ 4 X 2 X 16"
LA RG E RA Y
SMA LL RA Y
5/ 4 X 2 X 10"
1-1/ 2" W O O D SC REW
1: PREDRILL HO LES IN A LL RA YS W ITH A 1/ 8" DRILL BIT A T 3/ 4" O N C ENTER.
2: C ENTER THE 5/ 4 X 2 X 16" LA RG E RA Y O NTO THE HA LF SUN A ND THE RO O F SUPPO RT BO A RDS A ND FA STEN W ITH
TW O 1-1/ 2" SC REW S.
3: EQ UA LLY SPA C E THE SMA LL RA YS A BO UT THE HA LF SUN (THREE O N EA C H SIDE O F LA RG E RA Y) A ND MA RK THE
PO SITIO N O F THE SMA LL SUNRA YS W ITH A PENC IL.
4: SEC URE THE SMA LL SUNRA YS O NE A T A TIME TO THE HA LF SUN A ND THE RO O F SUPPO RT BEA MS A ND LINE THEM UP
W ITH THE MA RK DRA W N. FA STEN THE SMA LL SUNRA YS W ITH TW O 1-1/ 2" W O O D SC REW S EA C H. REPEA T O N O THER
SIDE O F FO RT.
NO TE:
RO O F BO A RDS REMO VED FRO M VIEW FO R C LA RITY
STEP 34: SUNBURST