
5/ 16" W A SHER
2 X 4 X 70"
2 X 6 X 70"
REA R TO P PA NEL BO A RD
SA NDBO X BO A RD
C O RNER PO STS FO R
THE LA G SC REW S.
LA G SC REW S A RE
SELF-TA PPING .
7: PLA C E THE FRA ME
IN ITS FINA L PO SITIO N
A ND FO LLO W THE
PRO C EDURES A T THE
FRO NT O F THE
MA NUA L TO LEVEL
A ND SQ UA RE THE
STRUC TURE. O NC E
THE FRA ME IS LEVEL,
SQ UA RE, A ND SET
INTO PO SITIO N; G O
BA C K A ND INSERT THE
5/ 16 X 3-1/ 2" LA G
SC REW S A ND 5/ 16"
W A SHERS IN A LL O F
THE REMA INING
HO LES O F THE 2 X 6
PA RTS. NO TE: THERE
W ILL NO T BE A NY
PREDRILLED
HO LES IN THE
5/ 16 X 4-1/ 2"
HEX BO LT
2 X 6 X 70"
REA R ENTRY BO A RD
STEP 6: REA R FRA ME A SSEMBLY
1: PLA C E THE 2 X 6 X 70" SA NDBO X BO A RD O N THE REA R O F THE C O RNER PO STS. THE O FFSET HO LES IN THE
SA NDBO X BO A RD MUST FA C E UP.
2: USE 5/ 16 X 4-1/ 2" HEX BO LTS A ND 5/ 16" W A SHERS TO A TTA C H THE TO P HO LES O F THE SA NDBO X BO A RD TO THE
T-NUTS INSTA LLED O N THE C O RNER PO STS. THE BO TTO M HO LES W ILL BE USED LA TER.
3: PLA C E THE 2 X 6 X 70" REA R ENTRY BO A RD O N THE FRO NT O F THE C O RNER PO STS. THE O FFSET HO LES IN
THE FRO NT FA C E BO A RD MUST FA C E UP.
4: USE 5/ 16 X 4-1/ 2" HEX BO LTS A ND 5/ 16" W A SHERS TO A TTA C H THE TO P HO LES O F THE REA R FA C E BO A RD TO THE T-
NUTS INSTA LLED O N THE C O RNER PO STS. THE BO TTO M HO LES W ILL BE USED LA TER.
5: PLA C E THE 2 X 4 X 70" REA R TO P PA NEL BO A RD O N THE FRO NT O F THE C O RNER PO STS. THE O FFSET HO LES IN THE
TO P PA NEL BO A RD M UST FA C E UP.
6: USE 5/ 16 X 4-1/ 2" HEX BO LTS A ND 5/ 16" W A SHERS TO A TTA C H THE TO P HO LES O F THE TO P PA NEL BO A RD TO
THE T-NUTS INSTA LLED O N THE C O RNER PO STS.