
STEP 22: IRON DUCTILES
1: LINE UP THE HOLES OF THE IRON DUCTILES WITH THE HOLES IN THE SWINGBEAM.
2: FASTEN THE SWING HANGER TO THE SWING BEAM USING 6-1/2" OR 7" CARRIAGE BOLTS (SIZE MAY VARY FROM
UNIT TO UNIT) WITH TORQUE WASHERS, AND 3/8" WASHERS WITH 3/8" LOCK NUTS.
3: PLACE BOLT CAPS OVER EXPOSED THREADS.
3/8" LOCK NUT
3/8" WASHER
BOLT CAPS
IRON DUCTILE
6-1/2" OR 7" CARRIAGE BOLT
TORQUE WASHER