
HEX BOLT
5/16 X 3-1/2"
5/16 X 4-1/2"
LAG SCREW
DETAIL A
2 X 6 X 70"
SANDBOX BOARD
5/16" WASHER
2 X 6 X 70"
SANDBOX BOARD
5/16" WASHER
5/16 X 4-1/2"
LAG SCREW
5/16" WASHER
HEX BOLT
5/16 X 3-1/2"
REAR OF FORT
2 X 4 X 70"
RAILING
A
STEP 24: ATTACHING SANDBOX BOARD & RAILING
1: PLACE THE 2 X 6 X 70" SANDBOX BOARD (OFFSET UP) AT THE BOTTOM OF THE REAR CORNER POSTS.
FASTEN THE TOP HOLES IN THE SANDBOX BOARD TO THE REAR CORNER POSTS WITH 5/16" X 4-1/2" HEX
BOLTS AND 5/16" WASHERS.
2: PLACE THE 2 X 4 X 70" UPPER LEVEL STEPS/RAILING BOARD (3 HOLES ON CENTER) AT THE TOP OF THE
REAR CORNER POSTS. THIS BOARD WILL GET ATTACHED TO THE 2ND HOLE DOWN FROM THE TOP OF
THE POSTS. THE T-NUT FOR THIS BOARD SHOULD BE ON THE INSIDE OF EACH POST ALREADY. FASTEN THE
UPPER LEVEL RAILING BOARD TO THE REAR CORNER POSTS WITH 5/16" X 4-1/2" HEX BOLTS AND 5/16"
WASHERS.
3: THE BOTTOM HOLES OF THE 2 X 6 X 70" SANDBOX BOARD SECURE AT THE BASE OF THE REAR CORNER
POSTS, WITH 5/16 X 3-1/2" LAG SCREWS AND 5/16" WASHERS.
68