
3
.
4
.
5 CCA connect to Internet
Figure3.4.5-1
Connect the cable terminal with the external WiFi module.
Figure3.4.5-1
The inverter complies with IEC62109-2 chapter 13.9. When earth fault occurs,the fault indicator LED on front cover will
light up, and, for wifi inverter, it will email the fault information to customer, for non wifi inverter ,the buzzer in
inverter will keep ringing 1 minute and ring again after half an hour unless the fault is resolved(This function is only
available to Australia/ New Zealand).
Note:1.Meter is non-standard accessories, if the need to use a meter, please contact GOODWE sales manager.
2.Supported DRM command: DRM0, DRM5, DRM6, DRM7, DRM8.
3.Please referto Meter instruction Guide.
4.DRED connection is only available forAustralia and New Zealand.
5.Meter is needed for implementing of export power limiting function.After installation, you need enable'Power Limit' function and
set export power limiting value on LCD via button according to next chapter 4.2.
3.4.7 Earth FauItAlarm
Figure3.4.6-1
3.4.6 Power Limiting Device&DRED Installation
Connection method of DT series power limiting meter please refer to Figure 3.4.6-1.
Meter
Inverter
AC Cable
Router
Switch Board
NOTE:
2-pin terminal is used to make connection to meter.You can find it inaccessory bag.
6-pin terminal is used to make connection to DRED device. If DRED device is not available, please keep it not connected.
Connection Procedure:
Put the cable through the components in this order: screw cap, one-hole sealing ring, insulation body and sheet metal parts.
Pull out the 6-pin terminal from the socket in the cabinet and take off the resistor which is fixed in it.Cable should be
connected as Figure 3.4.6-2.
Insert the green terminal into the corresponding interior terminal of the inverter. Pull cable softly to maintain the cable not to be
pulled out.
Lock the sheet metal parts onto the box and tighten the screw cap.
Summary of Contents for GW10KN-DT
Page 15: ...8 Certificates 25...