Goodman CVC9/95 Installation Instructions Manual Download Page 13

13

V

ENT

/F

LUE

 P

IPE

 & C

OMBUSTION

 A

IR

 P

IPE

T

O

 

AVOID

 

BODILY

 

INJURY

,

 

FIRE

 

OR

 

EXPLOSION

,

 

SOLVENT

 

CEMENTS

 

MUST

 

BE

 

KEPT

 

AWAY

 

FROM

 

ALL

 

IGNITION

 

SOURCES

 

(

I

.

E

.,

 

SPARKS

,

 

OPEN

 

FLAMES

,

 

AND

 

EXCESSIVE

 

HEAT

)

 

AS

 

THEY

 

ARE

 

COMBUSTIBLE

 

LIQUIDS

.

 

A

VOID

 

BREATHING

 

CEMENT

 

VAPORS

 

OR

 

CONTACT

 

WITH

 

SKIN

 

AND

/

OR

 

EYES

.

WARNING

Two- or three-inch nominal diameter PVC Schedule 40 pipe meet-
ing ASTM D1785, PVC primer meeting ASTM F656, and PVC
solvent cement meeting ASTM D2564 specifications must be used.
Fittings must be DWV type fittings meeting ASTM D2665 and
ASTM D3311.  Carefully follow the pipe manufacturer’s instruc-
tions for cutting, cleaning, and solvent cementing of PVC.

The use of Schedule 40 PVC Cellular Core (Foam Core) plastic
pipe is also acceptable as a flue/vent and intake pipe material.
PVC primer meeting ASTM F656 and PVC solvent cement meet-
ing ASTM D2564 specifications must be used. Fittings must be
DWV type fittings meeting ASTM D2665 and ASTM D3311. Care-
fully follow the manufactures instructions for cutting, cleaning and
solvent cementing of PVC.

M

ATERIALS

 

AND

 J

OINING

 M

ETHODS

As an alternative to PVC pipe, primer, solvent cement, and fittings,
ABS materials which are in compliance with the following specifi-
cations may be used.  Two-or-three-inch ABS Schedule 40 pipe
must meet ASTM D1527 and, if used in Canada, must be CSA
listed.  Solvent cement for ABS to ABS joints must meet ASTM
D2235 and, if used in Canada, must be CSA listed.  The solvent
cement for the PVC to ABS transition joint must meet ASTM D3138.
Fittings must be DWV type fittings meeting ASTM D2661 and
ASTM D3311 and, if used in Canada, must be CSA listed.  Care-
fully follow the manufacturers’ instructions for cutting, cleaning,
and solvent cementing PVC and/or ABS.

All 90° elbows must be medium radius (1/4 bend DWV) or long
radius (Long sweep 1/4  bend DWV) types conforming to ASTM
D3311.  A medium radius (1/4  bend DWV) elbow measures 3 1/
16” minimum from the plane of one opening to the centerline of the
other opening for 2” diameter pipe, and 4 9/16” minimum for 3”
pipe.

P

ROPER

 V

ENT

/F

LUE

 

AND

 C

OMBUSTION

 A

IR

 P

IPING

 P

RACTICES

Adhere to these instructions to ensure safe and proper furnace
performance. The length, diameter, and number of elbows of the
vent/flue pipe and combustion air pipe (when applicable) affects
the performance of the furnace and must be carefully sized.  All
piping must be installed in accordance with local codes and these
instructions.

Piping must be adequately secured and supported to prohibit sag-
ging, joint separation, and/or detachment from the furnace.  Hori-
zontal runs of vent/flue piping must be supported every three to five
feet and must maintain a 1/4 inch per foot downward slope, back
towards the furnace, to properly return condensate to the furnace’s
drain system.  Allowances should be made for minor expansion
and contraction due to temperature variations.  For this reason,
particular care must be taken to secure piping when a long run is
followed by a short offset of less than 40 inches.

Precautions should be taken to prevent condensate from freezing
inside the vent/flue pipe and/or at the vent/flue pipe termination.  All
vent/flue piping exposed to freezing temperatures below 35°F for
extended periods of time must be insulated with 1/2” thick closed
cell foam.  Also all vent/flue piping exposed outdoors in excess of
the terminations shown in this manual (or in unheated areas) must
be insulated with 1/2”  thick closed cell foam.  Inspect piping for
leaks prior to installing insulation.

T

ERMINATION

 L

OCATIONS

NOTE:

Refer to 

Location Requirements and Considerations

 for

combustion air contaminant restrictions.

The following bullets and diagram describe the restrictions con-
cerning the appropriate location of vent/flue pipe and combustion
air intake pipe (when applicable) terminations.  Refer to 

Non-Direct

Vent (Single Pipe) Piping

 and 

Direct Vent (Dual Pipe) Piping

 lo-

cated in this section for specific details on termination construc-
tion.

All terminations (flue and/or intake) must be located at
least 12 inches above ground level or the anticipated snow
level.

Vent terminations (non-direct and direct vent) must
terminate at least 3 feet above any forced air inlet located
within 10 feet.

NOTE:  

This provision does not apply to the combustion

air intake termination of a direct vent application.

The vent termination of a 

non-direct

 

vent

 application must

terminate at least 4 feet below, 4 feet horizontally from,
or 1 foot above any door, window, or gravity air inlet into
any building.

The vent termination of a 

direct vent

 application must

terminate at least 12 inches from any opening through
which flue gases may enter a building (door, window, or
gravity air inlet).

The vent termination of vent pipe run vertically through a
roof must terminate at least 12 inches above the roof line
(or the anticipated snow level) and be at least 12 inches
from any vertical wall (including any anticipated snow
build up).

A vent termination shall not terminate over public walkways
or over an area where condensate or vapor could create
a nuisance or hazard or could be detrimental to the
operation of regulators, relief valves, or other equipment.

The combustion air intake termination of a direct vent
application should not terminate in an area which is
frequently dusty or dirty.

Summary of Contents for CVC9/95

Page 1: ...customer This includes all safety precautions and related items Prior to actual installation thoroughly familiarize yourself with this Instruction Manual Pay special attention to all safety warnings...

Page 2: ...TION AIR PIPE 12 DUAL CERTIFICATION NON DIRECT DIRECT VENT 12 MATERIALS AND JOINING METHODS 13 PROPER VENT FLUE AND COMBUSTION AIR PIPING PRACTICES 13 TERMINATION LOCATIONS 13 CANADIAN VENTING REQUIRE...

Page 3: ...OPERATION 37 GAS SUPPLY PRESSURE MEASUREMENT 37 GAS MANIFOLD PRESSURE MEASUREMENT AND ADJUSTMENT 38 GAS INPUT RATE MEASUREMENT NATURAL GAS ONLY 39 TEMPERATURE RISE 39 CIRCULATOR BLOWER SPEEDS 40 BLOW...

Page 4: ...A LICENSE TO INSTALL OR SERVICE HEATING AND AIR CONDITIONING EQUIPMENT WARNING MAINTENANCE 50 ANNUAL INSPECTION 50 FILTERS 50 BURNERS 51 INDUCED DRAFT AND CIRCULATOR BLOWERS 51 CONDENSATE TRAP AND DRA...

Page 5: ...T CONDENSATION ELECTRICAL SHOCK OR CARBON MONOXIDE MAY RESULT FROM IMPROPER INSTALLATION REPAIR OPERATION OR MAINTENANCE OF THIS PRODUCT WARNING TO PREVENT PERSONAL INJURY OR DEATH DUE TO IMPROPER INS...

Page 6: ...incontactwithanungrounded object repeat step 2 before touching control or wires 4 Discharge your body to ground before removing a new control from its container Follow steps 1 through 3 if installing...

Page 7: ...t pipe is op tional and the furnace can be vented as a Non directvent singlepipe centralforcedairfurnacein which combustion air is taken from the installation area or from air ducted from the outside...

Page 8: ...ate the furnace so condensate flows downwards to the drain Do not locate the furnace or its condensate drainage system in any area subject to below freezing temperatures without proper freeze protecti...

Page 9: ...ichthisfurnacehasbeendesigncertified Theminimum clearanceinformationforthisfurnaceisprovidedontheunit sclear ance label These clearances must be permanently maintained Clearancesmustalsoaccommodateani...

Page 10: ...ontact your distributor for proper airflow requirements and number of required ductwork connec tions Refer to Recommended Installation Positions figure for appropriate installation positions ductwork...

Page 11: ...e from the heat ex changerandinduceddraftblower Forproperfluepipedrainage thefurnacemustbelevellengthwisefromendtoend Thefurnace should also be level from back to front or have a slight tilt with the...

Page 12: ...listing of appropriate manufacturer s kits for propane gas and or high altitude installa tions The indicated kits must be used to insure safe and proper furnaceoperation Allconversionsmustbeperformed...

Page 13: ...entfromthefurnace Hori zontalrunsofvent fluepipingmustbesupportedeverythreetofive feet and must maintain a 1 4 inch per foot downward slope back towardsthefurnace toproperlyreturncondensatetothefurnac...

Page 14: ...lbow should be installed on the combus tionairintake coupling toguardagainstinadvertentblockage Vent Termination Clearances NOTE InCanada theCanadianFuelGasCodetakesprecedence overtheprecedingterminat...

Page 15: ...the induced draft blower and the vent fluepipe 3 UpflowandCounterflowunits Removethevent fluepipefromthefurnace 4 Cut the vent flue pipe 3 75 inches from the flanged end of the pipe see Vent Flue Pip...

Page 16: ...n the blower deck with the plastic plug included in the drain kit bag 4 With the gasket facing the cabinet side panel and the flange sflatspotfacingforward securethecombustionair intakecouplingtotheca...

Page 17: ...58 55 52 49 46 43 40 3 71 68 65 62 59 56 53 50 2 or 2 1 2 61 58 55 52 49 46 43 40 3 71 68 65 62 59 56 53 50 115 000 3 71 68 65 62 59 56 53 50 UPFLOW Non Direct Vent Single Pipe Maximum Allowable Leng...

Page 18: ...run through an existing unused chimney however they must extend a minimum of 12 inches above the top of the chimney The space between the pipes and the chimney must be closed with a weather tight corr...

Page 19: ...stion Air Intake pipe 3 Minimum requirements for each Vent Flue Combustion Air Intake pipe is five 5 feet in length and one elbow tee 4 2 1 2 or 3 diameter pipe can be used in place of 2 diameter pipe...

Page 20: ...ommon roof top maintain the same minimum clear ances between the exhaust vent and air intake terminations of adjacentunitsaswiththeexhaustventandairintaketerminations of a single unit If more than one...

Page 21: ...llation and drain hose hook ups Thedraintrapsuppliedwiththefurnacemustbeused Thedrainlinebetweenfurnaceanddrainlocationmust be constructed of 3 4 PVC or CPVC Thedrainlinebetweenfurnaceanddrainlocation...

Page 22: ...be 1 into rubber elbow drain port and secure with silverhoseclamp Angletubeoutwardtowardfrontoffurnace 5 Cut173 4inchesfromthelongendofHoseBanddiscard Secure the remaining hose to Tube 1 with a green...

Page 23: ...ntheexternally mountedrubberelbow Discardcutportion 5 InsertTube1intorubberelbowdrainportandsecurewitha silver hose clamp Angle tube toward trap 6 Cut173 4inchesfromthelongendofHoseBanddiscard 7 Secur...

Page 24: ...or appropriate length to cut Secure remaininghosetoTube1withagreenhoseclamp Route other end of Hose B to front left side panel grommet hole NOTE Longhose B mustalwaysbeconnectedtoTube1and the elbow an...

Page 25: ...imize sagging Plug left unused pressure tap with plug removed from right side 2 Secure Hose A to front cover drain tap with a red hose clamp Routehosetorearright down sidepanelgrommet holes 3 Cut 1 4...

Page 26: ...ting a hose to the induced draft blower housing 6 Cut 5 1 2 inches straight length from the long end of each Tube 2 and discard radius ends 7 Insert approximately one inch of each Tube 2 through left...

Page 27: ...ust be observed when making field connections Line voltage connections can be made through either the right or left side panel The furnace is shipped configured for a right side left side for counterf...

Page 28: ...tablestodetermineiftherequiredsingle stage cooling airflow can be delivered at low stage Y1 input or high stage Y2 input Additionally use of ramping profile and dehumidificationfeaturesrequireajumperb...

Page 29: ...nable the dehumidify function on the integrated control mod ule setthedehumidificationENABLEdipswitchfromOFFtoON Oncetheswitchisset thedehumidifyfunctionisenabledduringa combinationcallforcooling T St...

Page 30: ...um 5 0 w c Maximum 10 0 w c Propane Gas Minimum 11 0 w c Maximum 13 0 w c Inlet Gas Supply Pressure HIGHALTITUDEDERATE Whenthisfurnaceisinstalledathighaltitude theappropriateHigh Altitude orifice kit...

Page 31: ...must supply a ground joint union drip leg manual shutoff valve and line and fittings to connect to gas valve In some cases the installer may also need to supply a transition piece from 1 2 pipe to a...

Page 32: ...MODEL MANUAL SHUT OFF VALVE UPSTREAM FROM GROUND JOINT PIPE UNION DRIP LEG GROMMET IN STANDARD GAS LINE HOLE DRAIN TRAP ALTERNATE GAS LINE LOCATION MANIFOLD PLUG IN ALTERNATE GAS LINE HOLE GAS VALVE G...

Page 33: ...3 48 kPA PROPANEGASTANKSANDPIPING IF THE GAS FURNACE IS INSTALLED IN A BASEMENT AN EXCAVATED AREA OR CONFINED SPACE IT IS STRONGLY RECOMMENDED TO CONTACT A PROPANE SUPPLIER TO INSTALL A GAS DETECTING...

Page 34: ...ities at 15 psig settings multiply by 1 130 To convert to capacities at 5 psig settings multiply by 0 879 Propane Gas Piping Chart I 3 8 1 2 5 8 3 4 7 8 1 2 3 4 1 1 1 4 1 1 2 10 39 92 199 329 501 275...

Page 35: ...duced by approximately 18 if duct flanges are not unfolded This could cause performance issues and noise issues EDGES OF SHEET METAL HOLES MAY BE SHARP USE GLOVES AS A PRECAUTION WHEN REMOVING SHEET M...

Page 36: ...uirement Disposable Minimum Filter area sq in Based on 300 ft min filter face velocity UPRIGHTINSTALLATIONS Dependingontheinstallationand orcustomerpreference differ ing filter arrangements can be app...

Page 37: ...control to the ON position 8 Replacetheburnercompartmentdoor 9 Openthemanualgasshutoffvalveexternaltothefurnace 10 Turnontheelectricalpowertothefurnace 11 Adjustthethermostattoasettingaboveroomtempera...

Page 38: ...ug before turning on gas to furnace 6 Turn OFF any unnecessary gas appliances stated in step 3 Gas Line Gas Shutoff Valve Gas Line To Furnace Drip Leg Cap With Fitting Manometer Hose Manometer Open To...

Page 39: ...atethefurnaceinputinBTUsperhour BTU hr Input equalsthesumoftheinstallation sgasheatingvalueanda conversionfactor hourstoseconds dividedbythenumber of seconds per cubic foot The measured input must not...

Page 40: ...smustbechecked for required air flow Any electronic air cleaners or other devices may require specific air flows consult installation instructions of thosedevicesforrequirements 3 Knowing the furnace...

Page 41: ...to the full demand airflow Profile D has a 1 2 minute at 50 airflow OFF delay OFF OFF AirflowTable Model Tap Low Stage Cool High Stage Cool Low Stage Heat High Stage Heat A 390 600 550 792 B 520 800 6...

Page 42: ...gle stage air conditioner Any other sys temconfigurationsareconsideredinvalidComfortNetsystemsand must be connected as a traditional or legacy system see Elec trical Connectionsfor wiring connections...

Page 43: ...wo Wires between Furnace and AC HP and Four Wires between Furnace and Thermostat CT COMPATIBLE FURNACE WITH NON CT COMPATIBLE SINGLE STAGEAIRCONDITIONER Fourwiresarerequiredbetweenthefurnaceandthermos...

Page 44: ...xt WORKING will be displayed in the scrolling display area while the data is being retrieved The first sub menu is then displayed See tables below for listing of furnace submenus Touch the or _ to ste...

Page 45: ...ecutively repeated faults are shown a maximum of 3 times DIAGNOSTICS Submenu Item Indication for Display Only not User Modifiable Model Number MOD NUM Displays the furnace model number Serial Number S...

Page 46: ...d press the IN STALLER CONFIG button Navigate to dF BAL PNT Adjust the dual fuel system balance point using the back forward ar rows DIAGNOSTICS Accessing the furnace s diagnostics menu provides ready...

Page 47: ...ds for an out of box reset Red Communications LED 2 Flashes x Out of box reset x Control power up x Learn button depressed x None x None Off x No power x Communications error x No power to furnace x O...

Page 48: ...circulatorblowerwillremainonhighheatingspeedforthirty 30 seconds before switching to the low heat circulating speed R and W1 or R and W1 W2 thermostat contacts open completing the call for heat Gasval...

Page 49: ...e burner manifold as sembly and monitor the burner flame They are normally closed electrically manual reset sensors These limits guard against burnerflamesnotbeingproperlydrawnintotheheatexchanger PRE...

Page 50: ...that all fur nacecomponentsareinproperworkingorderandthattheheating system functions appropriately Pay particular attention to the fol lowing items Repair or service as necessary Flue pipe system Chec...

Page 51: ...m the induced draft blower 4 Remove the induced draft blower drain and pressure tap hosesfromtherecuperatorcoilfrontcover 5 Removetherecuperatorcoilfrontcovertoexposethecoil tubesandturbulators 6 Remo...

Page 52: ...rmination ON A OFF OFF B ON OFF C OFF ON D ON ON Normal OFF OFF 10 ON OFF 10 OFF ON Normal ON ON A OFF OFF B ON OFF C OFF ON D ON ON A OFF OFF B ON OFF C OFF ON D ON ON Disabled OFF Unused Enabled ON...

Page 53: ...stion air piping front cover pressure switch opening or improper induced draft blower performance x Locate and correct gas interruption x Check front cover pressure switch operation hose wiring contac...

Page 54: ...heat IMPROPER FLAME E4 x Short to ground in flame sense circuit x Lingering burner flame x Slow closing gas valve x Correct short at flame sensor or in flame sensor wiring x Check for lingering flame...

Page 55: ...ir replace if necessary x Inspect flue and or inlet air piping for blockage proper length elbows and termination Check drain system Correct as necessary x Check induced draft blower performance Correc...

Page 56: ...lost communications with circulator blower motor MOTOR COMM b1 x Loose wiring connection at circulator motor control leads x Failed circulator blower motor x Failed integrated control module x Tighten...

Page 57: ...rmostat Call for Service icon illuminated x ComfortNet thermostat scrolls Check Furnace message b6 x Circulator blower motor shuts down for over or under voltage condition x Circulator blower motor sh...

Page 58: ...ATING CYCLE HIGH STAGE PRSSURE SWITCH STUCK OPEN REVERSED 115 VAC POLARITY DATA NOT YET ON NETWORK INVALID MEMORY CARD DATA BLOWER MOTOR NOT RUNNING BLOWER COMMUNICATION ERROR BLOWER HP MIS MATCH BLOW...

Page 59: ...NTROLS 40 VA Y2 14 IND LO MANUAL RESET ROLLOUT LIMIT CONTROLS 9 WH N PK PINK HUMIDIFIER INDOOR HIGH FIRE PRESS SWTICH DISCONNECT TWO STAGE GAS VALVE AIR CLEANER C ONLY 2 MANUFACTURER S SPECIFIED REPLA...

Page 60: ...IDIFIER 60HZ PKPINK N WH 9 MANUALRESETROLLOUT LIMITCONTROLS INDLO 14 Y2 40VA MANUALRESETAUXILIARYLIMIT CONTROLS 3 HUM OR JUNCTION BLWR PU PURPLE 1 CIRCULATOR BLOWER R 1 GND JUNCTIONBOX SWITCH TEMP NEU...

Reviews: