background image

28

T

O

 

AVOID

 

THE

 

POSSIBILITY

 

OF

 

EXPLOSION

 

OR

 

FIRE

NEVER

 

USE

 

A

 

MATCH

 

OR

 

OPEN

 

FLAME

 

TO

 

TEST

 

FOR

 

LEAKS

.

WARNING

I

F

 

THE

 

GAS

 

FURNACE

 

IS

 

INSTALLED

 

IN

 

A

 

BASEMENT

AN

 

EXCAVATED

 

AREA

 

OR

 

CONFINED

 

SPACE

IT

 

IS

 

STRONGLY

 

RECOMMENDED

 

TO

 

CONTACT

 

A

 

PROPANE

 

SUPPLIER

 

TO

 

INSTALL

 

A

 

GAS

 

DETECTING

 

WARNING

 

DEVICE

 

IN

 

CASE

 

OF

 

A

 

GAS

 

LEAK

.

S

INCE

 

PROPANE

 

GAS

 

IS

 

HEAVIER

 

THAN

 

AIR

ANY

 

LEAKING

 

GAS

 

CAN

   

SETTLE

 

IN

 

ANY

 

LOW

 

AREAS

 

OR

 

CONFINED

 

SPACES

.

P

ROPANE

 

GAS

 

ODORANT

 

MAY

 

FADE

MAKING

 

THE

 

GAS

 

UNDETECTABLE

   

EXCEPT

 

WITH

 

A

 

WARNING

 

DEVICE

.

• 

• 

WARNING

200 PSIG
Maximum

5 to 15  PSIG
(20 PSIG Max.)

Continuous

11" W.C.

Second Stage
Regulator

First Stage
Regulator

Propane Gas Installation (Typ.)

Figure 35

The gas piping may enter the left or right side of the furnace cabinet. The installer must supply rigid pipe long enough to reach
the outside of the cabinet to seal the grommet cabinet penetration.  A semi-rigid connector to the gas piping can be used outside the
cabinet per local codes. 1/2” NPT pipe and fittings are required.  For models with an “L” shaped manifold, a 4 1/2” long nipple
is required.  For models with a hook shaped manifold, a 2” long nipple is required.

 A semi-rigid connector to the gas piping can be used outside the cabinet per local codes. From the elbow, the length of pipe
and the fittings required will vary by the side chosen, location of union and cabinet width.  The union may be placed inside or
outside of the cabinet.

G

AS

 P

IPING

 C

HECKS

Before placing unit in operation, leak test the unit and gas connections.

Check for leaks using an approved chloride-free soap and water solution, an electronic combustible gas detector, or other approved
testing methods.

NOTE:

  Never exceed specified pressures for testing.  Higher pressure may damage the gas valve and cause subsequent overfiring,

resulting in heat exchanger failure.
Disconnect this unit and shutoff valve from the gas supply piping system before pressure testing the supply piping system with
pressures in excess of 1/2 psig (3.48 kPa).

Isolate this unit from the gas supply piping system by closing its
external manual gas shutoff valve before pressure testing supply
piping system with test pressures equal to or less than 1/2 psig
(3.48 kPA).

P

ROPANE

 G

AS

 T

ANKS

 

AND

 P

IPING

A gas detecting warning system is the only reliable way to detect a propane gas leak. Rust can reduce the level of odorant in propane
gas.  Do not rely on your sense of smell.  Contact a local propane gas supplier about installing a gas detecting warning system.  If the
presence of gas is suspected, follow the instructions listed in the 

Safety Considerations

 section of this manual.

All propane gas equipment must conform to the safety standards of the National Board of Fire Underwriters, NBFU Manual 58.

For satisfactory operation, propane gas pressure must be 10” WC
at the furnace manifold with all gas appliances in operation. Main-
taining proper gas pressure depends on three main factors:

1. Vaporization rate, depending on temperature of the liquid,

and “wetted surface” area of the container or containers.

2. Proper pressure regulation. (Two-stage regulation is

recommended for both cost and efficiency).

3. Pressure drop in lines between regulators, and between

second stage regulator and the appliance. Pipe size will
depend on length of pipe run and total load of all appliances.

Complete information regarding tank sizing for vaporization, rec-
ommended regulator settings, and pipe sizing is available from
most regulator manufacturers and propane gas suppliers.

Since propane gas will quickly dissolve white lead and most stan-
dard commercial compounds, special pipe dope must be used. Al-
ways use a pipe thread sealant approved for all gases.

Refer to the  illustration  for typical propane gas installations and
piping.

Summary of Contents for *CSS920402BN

Page 1: ...ETY PRECAUTION is a registered trademark of Maytag Corporation or its related companies and is used under license All rights reserved TABLE OF CONTENTS SAFETY CONSIDERATIONS 3 SHIPPING INSPECTION 4 EL...

Page 2: ...RAP PRIMING 33 FURNACE OPERATION 33 GAS SUPPLY PRESSURE MEASUREMENT 34 GAS MANIFOLD PRESSURE MEASUREMENT AND ADJUSTMENT 34 GAS INPUT RATE MEASUREMENT NATURAL GAS ONLY 35 TEMPERATURE RISE 36 CIRCULATOR...

Page 3: ...ns when install ing adjusting altering servicing or operating the furnace To ensure proper installation and operation thoroughly read this manual for specifics pertaining to the installation and appli...

Page 4: ...ome loose in transit In the event of damage the consignee should 1 Make a notation on delivery receipt of any visible damage to shipment or container 2 Notify carrier promptly and request an inspectio...

Page 5: ...for use with natural or propane gas NOTE If using propane a propane conversion kit is required Dual certification means that the combustion air inlet pipe is optional and the furnace can be vented as...

Page 6: ...ing combustion products outdoors through a proper venting system Special consideration should begiventovent fluepiperoutingandcombustionairintakepipewhenapplicable Referto Vent FluePipeandCombustion A...

Page 7: ...snecessary useanaccessory subbase seeSpecificationSheetapplicableforyourmodelfordetails Aspecialaccessorysubbasemustbeusedforupright counterflow unit installations over any combustible material includ...

Page 8: ...any unused openings in the venting system 2 Inspect the venting system for proper size and horizontal pitch as required by the National Fuel Gas Code ANSI Z223 1 or the Natural Gas and Propane Install...

Page 9: ...back drafting or improper combustion of gas fired appliances thereby exposing building occupants to gas combustion products that could include carbon monoxide If this furnace is to be installed in th...

Page 10: ...tothefurnacesidepanel suspendingitbelowthefurnace Aminimum clearance of 5 5 below the furnace must be provided for the drain trap Additionally the appropriate downward piping slope must be maintained...

Page 11: ...all vent flue piping and connectorsarecompatiblewithfurnaceflueproducts Additionally itistheresponsibilityoftheinstallertoensurethatallpipingand connections possess adequate structural integrity and s...

Page 12: ...n from a 2 to 3 pipe in a horizontal section of pipe as this may create a water trap PREFERRED TRANSITION NO LESS THAN 45 DEGREES TO HORIZONTAL PLANE TO AVOID CREATING A WATER TRAP IN VENT PIPING ACCE...

Page 13: ...orted Vent FluePipe The vent pipe outlet is sized to accept 2 pipe Secure vent flue pipe directly into the furnace fitting with the appropriate glue Alternately a small section of 2 pipe may be glued...

Page 14: ...r outlet 5 Install cut end of the flanged section and connect to inducer with rubber coupling supplied with furnace 6 Install screws removed in step 1 securing flange to cabinet THE RUBBER ELBOW IS NO...

Page 15: ...ness plus the depth of the socket fittings to be installed on the inside and outside of the wall The wall penetration should be sealed with silicone caulking material NOTE Terminate both pipes in the...

Page 16: ...Condensate trapped to prevent flue gas from escaping and routed to field supplied condensate disposal Combustion Air Pipe Vent Pipe All piping and fittings must be joined per material manufacturer s s...

Page 17: ...termining the number of elbows in the piping systems If the combustion air intake pipe is to be installed above a finished ceiling or other area where dripping of condensate will be objectionable insu...

Page 18: ...Refer to the directions furnished with the Side Wall Vent Kit p n 0170K00000S or 0170K00001S for installation specifica tions CONDENSATE DRAIN LINES DRAIN TRAP A condensing gas furnace achieves its hi...

Page 19: ...ed horizontally require the trap to be relocated Many drain hoses have a built in grommet which will provide a cabinet seal when installed See instructions below for your model and installation positi...

Page 20: ...Remove the trap and two hoses from the blower deck 4 Remove the two plugs from the right side of the cabinet and install them in the blower deck 5a Draining the Vent Elbow Locate hose 2 factory instal...

Page 21: ...e the trap to the cabinet using two screws removed in step 2 by inserting the two screws through the large set of holes in the top mounting tabs of the trap into the two predrilled holes in the side o...

Page 22: ...clamps 7 Fasten the drain trap to the cabinet with two screws removed in step 2 8 Refer to Field Supplied Drain section for instructions on field supplied installed drain on outlet of furnace trap COU...

Page 23: ...e observed when making field connections Line voltage connections can be made through either the right or left side panel The furnace is shipped configured for a left side right side for counterflows...

Page 24: ...ig ured for a left side electri cal connection To make electrical connections through the opposite side of the furnace the junction box must be relocated to the left side prior to making electrical co...

Page 25: ...The combination of the lower air density and a lower manifold pressure will prohibit the burner orifice from drawing the proper amount of air into the burner This may cause incomplete combustion flash...

Page 26: ...valve and line and fittings to connect to gas valve In some cases the installer may also need to supply a transition piece from 1 2 pipe to a larger pipe size Thefollowingstipulationsapplywhenconnect...

Page 27: ...rd Gas Line Hole Ground Joint Pipe Union Ground Joint Pipe Union NOTE Union may be inside furnace cabinet where allowed by local codes COUNTERFLOW Figure 32 Drip Leg Plug in Main Gas Line Hole Alterna...

Page 28: ...sulting in heat exchanger failure Disconnect this unit and shutoff valve from the gas supply piping system before pressure testing the supply piping system with pressures in excess of 1 2 psig 3 48 kP...

Page 29: ...g plate for the maximum ESP ex ternal duct static rating Total external static refers to everything external to the fur nace cabinet Cooling coils filters ducts grilles registers must all be considere...

Page 30: ...s retaining the sheet metal over the duct opening Using tin snips cut the metal strips and remove the sheet metal covering the duct opening In the corners of the open ing cut the sheet metal along the...

Page 31: ...BN 2 10 X 20 or 1 16 X 25 Top Return CSS9 0804CN 2 10 X 20 or 1 16 X 25 Top Return CSS9 1005CN 2 14 X 20 or 1 20 X 25 Top Return CSS961205DN 2 14 X 20 or 1 20 X 25 Top Return Other size filters of equ...

Page 32: ...11 5 2 X 1600 CFM 2 16 in X 25 in x 5 AM11 3225 5 AM11 3225 AM11 5PP AM11 5 AM11 5RA AM11 5PP Family Family Family Upright Installations Depending on the installation and or customer preference differ...

Page 33: ...uipped with an ignition device which automatically lights the burner Do not try to light the burner by hand 5 Move the furnace gas valve manual control to the OFF position 6 Wait five minutes then sme...

Page 34: ...2 gas valve then use the 36G J Valve Pressure Check Kit Part No 0151K00000S 3 TurnONthegassupplyandoperatethefurnaceandallothergasconsuming appliances on the same gas supply line 4 Measure furnace gas...

Page 35: ...s to gas conversion consult your dealer for appropriate conversion GAS INPUT RATE MEASUREMENT NATURAL GAS ONLY The actual gas input rate to the furnace must never be greater than that specified on the...

Page 36: ...stalled with the furnace If the cooling capacity is in BTU hr divide it by 12 000 to convert capacity to tons Example Cooling Capacity of 30 000 BTU hr 30 000 12 000 2 5 Tons 2 Determine the proper ai...

Page 37: ...rol module monitors flame presence Gas valve will remain open only if flame is detected Circulator blower is energized on heat speed following a thirty 30 second blower on delay 96 models 115 VAC EAC...

Page 38: ...rmally closed electrically automatic reset temperature activated sensor The limit guards against overheating as a result of insufficient conditioned air passing over the heat exchanger AUXILIARY LIMIT...

Page 39: ...e control is in standby mode no call for heat or cool press the FAULT RECALL switch for five to ten seconds or until the diagnostic LED begins to rapid flash When the switch is released the LED will t...

Page 40: ...e To remove 1 Turn OFF electrical power to furnace 2 Remove filter s from the central return register or ductwork 3 Replace filter s by reversing the procedure for removal 4 TurnONelectricalpowertofur...

Page 41: ...should be as indicated in the Specifications Sheet FLUE PASSAGES QUALIFIED SERVICER ONLY The heat exchanger flue passageways should be inspected at the beginning of each heating season BEFORE LEAVING...

Page 42: ...Loose or improperly connected wiring Pressure switch circuit not closed Induced draft blower is operat ing Induced draft blower runs continuously with no further furnace operation Integrated control m...

Page 43: ...5 5 FLASHES Short to ground in flame sense circuit Furnace fails to operate Integrated control module diagnostic LED is flashing SIX 6 flashes No furnace operation Rollout limit open Integrated contro...

Page 44: ...5 1084 1005 HIGH 5 0 2284 30 2231 31 2170 31 2103 32 2037 33 1945 1836 1750 MED 4 0 1865 37 1869 36 1775 38 1732 39 1684 40 1619 1548 1480 MED LO 3 5 1594 43 1571 43 1530 45 1492 46 1454 47 1414 1355...

Page 45: ...N A 610 N A 604 571 519 HIGH 5 0 2233 32 2159 33 2086 34 2024 35 1941 37 1850 1753 1651 MED 4 0 1820 39 1778 40 1742 41 1695 42 1638 43 1551 1485 1384 MED LO 3 5 1571 45 1535 46 1497 48 1446 49 1402...

Page 46: ...TIONS N E C CLASS 2 WIRE GR GND 115 VAC 24 VAC BLOWER COMPARTMENT DOOR SWITCH OPEN WHEN DOOR OPEN DOOR SWITCH WARNING DISCONNECTPOWER BEFORE SERVICING WIRING TO UNITMUSTBE PROPERLY POLARIZED AND GROUN...

Page 47: ...GND 115 VAC 24 VAC BLOWER COMPARTMENT DOOR SWITCH OPEN WHEN DOOR OPEN DOOR SWITCH WARNING DISCONNECTPOWER BEFORE SERVICING WIRING TO UNITMUST BE PROPERLY POLARIZEDAND GROUNDED BK GND DISCONNECT L N PO...

Page 48: ...tly mounted to the exterior of the building at a minimum height of eight 8 feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or...