background image

17

V

ENT

/F

LUE

 

AND

  C

OMBUSTION

  A

IR

  P

IPE

  L

ENGTHS

 

AND

  D

IAMETERS

Refer to the following table for applicable length, elbows, and pipe
diameter for construction of the vent/flue and combustion air intake
pipe systems of a direct vent (dual pipe) installation.  The number of
elbows tabulated represents the number of elbows and/or tees in each
(Vent/Flue & Combustion Air Intake) pipe.  Elbows and/or tees used in
the terminations must be included when determining the number of
elbows in the piping systems.
If the combustion air intake pipe is to be installed above a finished
ceiling or other area where dripping of condensate will be objection-
able, insulation of the combustion air pipe may be required.  Use 1/2”
thick closed cell foam insulation such as Armaflex or Insultube where
required.

V

ENT

/F

LUE

 

AND

  C

OMBUSTION

  A

IR

  P

IPE

  T

ERMINATIONS

The vent/flue and combustion air pipes may terminate vertically, as
through a roof, or horizontally, as through an outside wall.

Vertical pipe terminations should be as shown in the following figure.

Refer to Section IX, Vent/Flue Pipe and Combustion Pipe - Termina-
tion Locations

 for details concerning location restrictions.  The pen-

etrations through the roof must be sealed tight with proper flashing
such as is used with a plastic plumbing vent

Horizontal terminations should be as shown in the following figure.
Refer to 

Section IX, Vent/Flue Pipe and Combustion Pipe - Termina-

tion Location

 for location restrictions.   A 2 3/8” diameter  wall penetra-

tion is required for 2” diameter pipe.  A 3” diameter hole is required for
a 2 1/2” pipe and a  3 1/2” diameter hole is required for 3” diameter
pipe.  To secure the pipe passing through the wall and prohibit dam-
age to piping connections, a coupling should be installed on either
side of the wall and solvent cemented to a pipe connecting the two
couplings.  The pipe length  should be the wall thickness plus the
depth of the socket fittings to be installed on the inside and outside of
the wall.  The wall penetration should be sealed with silicone caulking
material.

DRAIN
TRAP

FRONT COVER

DRAIN PORT

TUBE(S) 2

GREEN

HOSE

CLAMPS

(3 PLACES)

RIGHT SIDE

PANEL

RUBBER ELBOW 

DRAIN PORT

TUBE 1

SIDE PANEL

GROMMET

HOLES

HOSE

B

HOSE

 A

RUBBER

ELBOW

RED HOSE

CLAMP

SILVER HOSE CLAMP

Upright “Standard” Connections - Left Side

LEFT

SIDE PANEL

FRONT COVER

DRAIN PORT

HOSE A

SIDE PANEL

DRAIN

 HOLES

TUBE(S) 2

DRAIN

TRAP

GREEN HOSE

CLAMPS

(3 PLACES)

TUBE 1

RUBBER

ELBOW

HOSE B

RUBBER

ELBOW

DRAIN PORT

RED  HOSE

CLAMP

SILVER  HOSE

CLAMP

Summary of Contents for AKSS9/GKS9

Page 1: ...ibility to install the product safely and to know it well enough to be able to instruct a customer in its safe use Safety is a matter of common sense a matter of thinking before acting Most dealers ha...

Page 2: ...ND COMBUSTION AIR PIPING PRACTICES 13 TERMINATION LOCATIONS 13 CANADIAN VENTING REQUIREMENTS 14 STANDARD FURNACE CONNECTIONS 14 ALTERNATE FURNACE CONNECTIONS 14 NON DIRECT VENT SINGLE PIPE PIPING 15 D...

Page 3: ...MODE 31 COOLING MODE 31 FAN ONLY MODE 31 XVI Operational Checks 31 BURNER FLAME 31 XVII Safety Circuit Description 32 GENERAL 32 INTEGRATED CONTROL MODULE 32 PRIMARY LIMIT 32 AUXILIARY LIMIT 32 ROLLOU...

Page 4: ...ANCE DO NOT TOUCH ANY ELECTRICAL SWITCH DO NOT USE ANY PHONE IN YOUR BUILDING IMMEDIATELY CALL YOUR GAS SUPPLIER FROM A NEIGHBORS PHONE FOLLOW THE GAS SUPPLIERS INSTRUCTIONS IF YOU CANNOT REACH YOUR G...

Page 5: ...by the furnace to areas outside the space containing the furnace the return air shall also be handled by duct s sealed to the furnace casing and terminating outside the space containing the furnace A...

Page 6: ...THE UNIT IS IN A BUILDING THAT IS OR WILL BE VACANT CARE SHOULD BE TAKEN TO ROUTINELY INSPECT MAINTAIN AND MONITOR THE UNIT IN THE EVENT THAT THE BUILDING MAY BE EXPOSED TO FREEZING TEMPERATURES AND...

Page 7: ...ow furnace may be the same width as the furnace or may be one size larger than the furnace Example a C width coil may be installed with a B width furnace For upflow applications the front of the coil...

Page 8: ...ostat where it may be influ enced by any of the following Drafts or dead spots behind doors in corners or under cabinets Hot or cold air from registers Radiant heat from the sun Light fixtures or othe...

Page 9: ...atisfactory combustion of gas proper venting and the maintenance of ambient temperature at safe limits under normal conditions of use Equipment shall be located so as not to interfere with proper circ...

Page 10: ...ting of all equipment in the enclosure Outlet air duct Inlet air duct If the appliance room is located against an outside wall and the air openings communicate directly with the outdoors each opening...

Page 11: ...panel s and or basepan For horizontal upflow furnaces return air ductwork must be attached to the basepan NOTE Ductwork must never be attached to the back of the furnace Contact your distributor for...

Page 12: ...dard altitude Propane gas installations require an orifice change to compensate for the energy content difference between natural and propane gas For furnaces being converted to LP gas it is strongly...

Page 13: ...be CSAlisted The solvent cement for the PVC toABS transition joint must meet ASTM D3138 Fittings must be DWV type fittings meetingASTM D2661 andASTM D3311 and if used in Canada must be CSA listed Car...

Page 14: ...ent Vent Flue Terminations Grade or Highest Anticipated Snow Level 3 min 12 min 4 min 12 min Vent Termination Clearances NOTE In Canada the Canadian Fuel Gas Code takes precedence over the preceding t...

Page 15: ...of the alternate vent flue location for upright installations requires the drain trap be installed on the same side of the unit as the flue pipe 8 For horizontal installations externally secure the f...

Page 16: ...e pipe passing through the wall and prohibit damage to piping connections a coupling should be installed on either side of the wall and solvent ce mented to a length of pipe connecting the two couplin...

Page 17: ...strictions The pen etrations through the roof must be sealed tight with proper flashing such as is used with a plastic plumbing vent Horizontal terminations should be as shown in the following figure...

Page 18: ...ation 0 24 Vent termination from wall 8 min 12 max Combustion air intake from wall 6 max Vent and intake clearance to ground or anticipated snow level 12 min ____________________________________ SCREE...

Page 19: ...lets at the same elevation and always terminate all air intakes at the same elevation HOSE A HOSE B SIDE PANEL GROMMET HOLES GREEN HOSE CLAMP 3 PLACES TUBE 1 RUBBER ELBOW RIGHT SIDE PANEL DRAIN TRAP T...

Page 20: ...onnected to drain ports on the rubber elbow and the recuperator coil front cover The drain lines are then routed through the right or left side panel and into the drain trap secured to the outside of...

Page 21: ...e hose to rear right down side panel grommet holes 3 Cut 1 4 inch from the end of the drain port on the rubber elbow and discard 4 Insert Tube 1 into rubber elbow drain port and secure with a silver h...

Page 22: ...diagram for wire routings If any of the original wire as supplied with the furnace must be replaced it must be replaced with wiring material having a temperature rating of at least 105 C Any re placem...

Page 23: ...bination of the lower air density and a lower manifold pressure will prohibit the burner orifice from drawing the proper amount of air into the burner This may cause incomplete combustion flash back a...

Page 24: ...E PROPERTY DAMAGE PERSONAL INJURY OR DEATH MAY OCCUR IF THE CORRECT CONVERSION KITS ARE NOT INSTALLED THE APPROPRIATE KITS MUST BE APPLIED TO ENSURE SAFE AND PROPER FURNACE OPERATION ALL CONVERSIONS M...

Page 25: ...t in operation leak test the unit and gas connec tions TO AVOID THE POSSIBILITY OF EXPLOSION OR FIRE NEVER USE A MATCH OR OPEN FLAME TO TEST FOR LEAKS WARNING Check for leaks using an approved chlorid...

Page 26: ...00 185 390 590 Data in accordance with NFPA pamphlet NO 54 Propane Gas Piping Chart II XIII CIRCULATING AIR FILTERS DUCTWORK AIR FLOW Duct systems and register sizes must be properly designed for the...

Page 27: ...oling coil it is recommended that a removable access panel be provided in the outlet air duct This opening shall be accessible when the furnace is installed and shall be of such a size that the heat e...

Page 28: ...the manual gas shutoff valve external to the furnace 2 Turn off the electrical power to the furnace 3 Set the room thermostat to the lowest possible setting 4 Remove the burner compartment door NOTE...

Page 29: ...se from the hose barb fitting or inlet pressure boss 11 Replace inlet pressure tap a Honeywell VR8215 valve Remove the 1 8 NPT hose barb fitting from the inlet pressure tap Replace the inlet pressure...

Page 30: ...ubic foot Input 1 000 BTU ft3 x 3600 sec hr 34 sec ft3 Input 106 000 BTU hr Minor changes to the input rate may be accomplished through mani fold pressure adjustments at the gas valve Refer to Section...

Page 31: ...ed following a fixed thirty second blower on delay Furnace runs integrated control module monitors safety circuits continuously R and W thermostat contacts open completing the call for heat Gas valve...

Page 32: ...ct electrical components Use the following precautions during furnace installation and servicing to protect the integrated control module from damage By putting the furnace the control and the person...

Page 33: ...ace Toremove 1 Turn OFF electrical power to furnace 2 Remove filter s from the central return register or ductwork 3 Replace filter s by reversing the procedure for removal 4 Turn ON electrical power...

Page 34: ...g is an indication of an operational problem Perform the checks listed in Section XIV Startup Procedure andAdjustments to reduce the chances of repeated fouling XX BEFORE LEAVING AN INSTALLATION Cycle...

Page 35: ...kage proper length elbows and termination Check drain system Correct as necessary Correct pressure switch setpoint or contact motion Tighten or correct wiring connection Pressure switch hose blocked p...

Page 36: ...and circulation blower runs continuously No furnace operation Integrated control module diagnostic LED is flashing FIVE 5 flashes Flame sensed with no call for heat Correct short at flame sensor or i...

Page 37: ...OW 1 5 757 44 753 44 734 45 704 47 674 49 620 524 438 HIGH 3 0 1449 36 1409 37 1326 39 1273 41 1201 43 1194 1136 1018 AKSS90703BX MED 2 5 1192 43 1172 44 1141 45 1094 47 1046 49 973 904 793 MED HI MED...

Page 38: ...LOW 1 5 757 44 753 44 734 45 704 47 674 49 620 524 438 HIGH 3 0 1449 36 1409 37 1326 39 1273 41 1201 43 1194 1136 1018 GKS90703BX MED 2 5 1192 43 1172 44 1141 45 1094 47 1046 49 973 904 793 MED HI ME...

Page 39: ...PED 3 IF ANY OF THE ORIGINAL WIRE AS SUPPLIED WITH THE FURNACE MUST BE REPLACED IT MUST BE REPLACEDWITH WIRING MATERIAL HAVING A TEMPERATURE RATING OF AT LEAST 105 TERMINAL SWITCH PRESS 5 UNIT MUST BE...

Page 40: ...fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OBSTRUCTIONS 4 INSPECTION The state or local ga...

Reviews: