FURNACE SPECIFICATIONS
15
1. These furnaces are manufactured for natural gas operation. Optional kits are available for conversion to propane operation.
2. For elevations above 2000 feet the rating should be reduced by 4% for each 1000 feet above sea level. The furnace must not be derated, orifice changes should only
be made if necessary for altitude.
3. The total heat loss from the structure as expressed in TOTAL BTU/HR must be calculated by the manufacturers method or in accordance with the "A.S.H.R.A.E.
GUIDE" or "MANUAL J-LOAD CALCULATIONS" published by the AIR CONDITIONING CONTRACTORS OF AMERICA. The total heat loss calculated should be equal
to or less than the heating capacity. Output based on D.O.E. test procedures.
4. Minimum Circuit Ampacity calculated as: (1.25 x Circulator Blower Amps) + I.D. Blower Amps.
Unit specifications are subject to change without notice.
ALWAYS
refer to the units serial plate for the most up-to-date general and electrical information.
MODEL
*MVM960603
BXB*
*CVM960604
CXB*
Btuh
Input (US)
60,000
60,000
Output (US)
57,600
57,600
Input (CAN)
60,000
60,000
Output (CAN)
57,600
57,600
A.F.U.E.
96.0%
96.0%
Rated External Static (" w.c.)
.20 - .50
.20 - .50
Temperature Rise (°F)
20-50
20-50
ID Blower Pressure Switch Trip Point (" w.c.)
-0.81
-0.86
Front Cover Pressure Switch Trip Point (" w.c.)
-0.10
-0.10
Blower Wheel (D" x W")
10 x 8
10 x 10
Blower Horsepower
3/4
3/4
Blower Speeds
Variable
Variable
Max CFM @ 0.5 E.S.P.
1400
1760
Power Supply
115-60-1
115-60-1
Minimum Circuit Ampacity (MCA)
(1)
10.6
10.6
Maximum Overcurrent Device
(2)
15.0
15.0
Transformer (VA)
40
40
Primary Limit Setting (°F)
140
155
Auxiliary Limit Setting (°F)
120
120
Rollout Limit Setting (°F)
250
250
Fan Delay On Heating
30 secs.
30 secs.
Off Heating
(3)
150 secs.
150 secs.
Fan Delay On Cooling
6 sec.
6 sec.
Off Cooling
45 secs.
45 secs.
Gas Supply Pressure (Natural/Propane) ("w.c.)
7 / 11
7 / 11
Manifold Pressure (Natural/Propane) ("w.c.)
3.5 / 10
3.5 / 10
Orifice Size (Natural/Propane)
45 / 1.25mm
45 / 1.25mm
Number of Burners
3
3
Vent Connector Diameter (inches)
(4)
2
2
Combustion Air Connector Diameter (inches)
(5)
2
2
Shipping Weight (lbs.)
132
139
(1)
Wire size should be determined in accordance with National Electrical Codes. Extensive wire runs will require larger wire sizes.
(2)
Maximum Overcurrent Protection Device: May use Time Delay Fuse or HACR type Circuit Breaker of the same size as noted.
(3)
Off Heating - this fan delay timing is adjustable (100 and 150 seconds). Furnaces are shipped with 150 second off delay.
(4)
See Installation Instructions for appropriate vent diameter, length and number of elbows.
(5)
See Installation Instructions for appropriate combustion air pipe diameter, length and number of elbows.
NOTE: This data is provided as a guide, it is important to electrically connect the unit and properly size fuses/circuit breakers and wires in