
PRODUCT DESIGN
55
3. Attach PVC drain line to drain trap outlet with either a
90° elbow or coupling.
NOTE:
Ensure hoses and tubes maintain a downward slope
for proper drainage and that they are not kinked or binding.
Horizontal Installations
RIGHT SIDE DOWN
Horizontal installations with the right side down require that
the drain hoses be connected to the right side front cover
drain port and the rubber elbow drain port.
HOSE A
HOSE B
SIDE PANEL
GROMMET
HOLES
GREEN
HOSE
CLAMP
(3 PLACES)
TUBE 1
RUBBER
ELBOW
RIGHT
SIDE
PANEL
DRAIN TRAP
TUBES 2
RUBBER ELBOW
DRAIN PORT
FRONT COVER
DRAIN PORT
FRONT
COVER
PRESSURE
TAP
RED HOSE
CLAMP
RED HOSE
CLAMP
90% Furnace Horizontal
Drain Hose Connections (Right Side Down)
NOTE:
Ensure hoses and tubes maintain a downward slope
for proper drainage and are not kinked or bound.
For details concerning mounting of the drain trap, refer to
Condensate Drain Lines and Drain Trap - Horizontal Drain
Trap Mounting section
in this manual or the installation in-
structions.
LEFT SIDE DOWN
Horizontal installations with the left side panel down will
require drain hoses to be connected to the left side front
cover drain port and the induced draft blower drain port.
NOTE:
Relocation of the front cover pressure switch hose
is required from the right side (as shipped) pressure tap to
the left (down) side tap. The pressure switch hose must be
connected to the down side to guard against blocked drain
conditions. The hose must be cut to appropriate length to
minimize sagging.
LEFT SIDE
PANEL
FRONT COVER
DRAIN PORT
SIDE PANEL
GROMMET
HOLES
DRAIN TRAP
TUBE(S) 2
GREEN HOSE
CLAMPS
(3 PLACES)
HOSE A
HOSE B
INDUCED
DRAFT BLOWER
DRAIN PORT
FRONT
COVER
PRESSURE
TAP
RED HOSE CLAMP
90% Furnace Horizontal
Drain Hose Connections (Left Side Down)
NOTE:
Ensure hoses and tubes maintain a downward slope
for proper drainage and that they are not kinked or binding.
For details concerning mounting of the drain trap, refer to
Condensate Drain Lines and Drain Trap - Horizontal Drain
Trap Mounting
in this manual or the installation instructions.
Horizontal Drain Trap Mounting (Left or Right Side
Panel)
1. Position the drain trap against side panel with drain tubes
inserted into trap. Note that the trap may be orientated
with the outlet facing either the furnace’s top cover or
base pan.
2. Secure drain trap to side panel at the dimples or
crosshairs located on either side of the grommet drain
holes.
3. Confirm that tubes reach bottom of drain trap and that
all hoses maintain a downward slope and are not kinked
or binding.
4. Attach PVC drain line to drain trap outlet with either a
90° elbow or coupling.
GAS SUPPLY AND PIPING
The furnace rating plate includes the approved furnace gas
input rating and gas types. The furnace must be equipped
to operate on the type of gas applied. This includes any
conversion kits required for alternate fuels and/or high alti-
tude.