MEMORY MODULE: M-IP-GB2
5
WIRING DIAGRAM:
Access panel
Mains
100~240Vac
N
L
CN
BUS (M) BUS(PL)
FA-
2 B
GB /
L
or
BUS
BUS
BUS
BUS
D2
D1
D2L-
GB2
End of
line
ON
BUS
BUS
BUS
BUS
D2
D1
D2L-
2
GB
APARTMENT 2
APARTMENT 1
OFF
(1)
(1)
( )
3
**
( )
*
( )
BUS
BUS
( )
3
**
( )
( )
3
**
( )
( )
3
**
( )
VESTA2 SE
Master
( )
3
**
( )
BUS
( )
3
**
( )
APARTMENT 23
Video door entry system building installation with M-IP-GB2 image module.
AP
(2)
NA2
+
AP-
C1 NA1
AP+
C2 AP+ AP- P1 P2 BUSBUS
Relay 2
Relay 1
_
12Vdc
ON
1 2 3 4 5 6
SW1
Coded panel
(2)
Button panel
Configure the end of line in
the last monitor.
DIP 6 to On.
Remove the jumper from all
of the distributors except
the last.
**
( )
*
( )
Place the jumper in the GB2 monitors position of all of the D2L-GB2 distributors.
(1)
( )
2
For the connection of an AC lock release or a 2nd lock release, see the manual supplied with the door panel.
For description, installation, configuration, distances, cross-sections and programming of the monitor and door panel, see the
corresponding manual.
( )
3
I
mportant:
Button building
mode
or
Coded building
mode
12 Vdc / 270mA
( )
3
VESTA2 SE
Master
(DS)
(M)
M IP
-
-GB2
BUS
BUS
VESTA2 SE
Master
End of
line